My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02262018
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2018
>
PL PACKET 02262018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 8:40:08 AM
Creation date
2/20/2018 3:22:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SOUTHERN GATEWAY (THE VILLAGE LLC) 02/19/2018 <br />REVISED TRAFFIC STUDY <br />CITY OF SAINT ANTHONY <br />WSB PROJECT NO. 2170-300 PAGE 25 <br /> <br />CONCLUSIONS / RECOMMENDATIONS <br /> <br />Based on the analysis documented in this Study, WSB has concluded the following: <br /> <br />• The proposed Southern Gateway (revised The Village LLC) development is <br />anticipated to consist of 414 total units (200 multi-family apartment residential <br />units, 61 senior living units and 128 assisted living units). Access from the site will <br />be through driveway connections to Stinson Blvd at 26th Street and to Kenzie <br />Terrace at the existing Lowry Grove entrance. <br /> <br />• The proposed Southern Gateway (revised The Village LLC) development is <br />anticipated to generate an additional 2,163 daily trips, 164 AM peak trips and 233 <br />PM peak trips. The new Southern Gateway development generates less than half of <br />what the previous development (The Village LLC) development was anticipated to <br />generate. <br /> <br />• Existing traffic operations analysis shows that all intersection and driveways are <br />operating at an overall LOS C or better during both the weekday AM and PM peak <br />hours except the intersection of St Anthony Blvd at New Brighton Blvd which is <br />operating at a LOS D during the PM Peak Hour. There will be some movements that <br />will be operating at LOS D or LOS E. <br /> <br />• Intersection traffic operations for the future 2030 no-build condition show that all <br />intersection and driveways will operate at an overall LOS C or better during both the <br />weekday AM and PM with the existing intersection geometrics and traffic control, <br />except the intersection of St Anthony Blvd at New Brighton Blvd which is operating <br />at a LOS D during the PM Peak Hour. With the increase in traffic, some movements <br />will be operating at LOS D or LOS E. <br /> <br />• Intersection traffic operations for the future build condition show that, assuming the <br />addition of Southern Gateway development traffic, all intersection and driveways <br />will be operating at an overall LOS C or better in 2019 and 2030 during both the <br />weekday AM and PM peak hours with the existing intersection geometrics and <br />traffic control, except the intersection of St Anthony Blvd at New Brighton Blvd <br />which is operating at a LOS D during the PM Peak Hour. With the increase in traffic, <br />some movements will be operating at LOS D, LOS E or LOS F. <br /> <br />• Based on the vehicle queuing analysis for the existing and future traffic conditions <br />for weekday AM and PM peak hours several locations were identified that would <br />exceed existing turn lane storage lengths. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.