My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02262018
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2018
>
PL PACKET 02262018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 8:40:08 AM
Creation date
2/20/2018 3:22:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 20, 2018 <br />Page 4 <br /> <br />Building B Senior housing 128 <br />3 story peaked roof <br />31’5” to main eave, <br />45.5 feet total <br />Building C Market‐rate 225 <br />4 story flat roof, 44’ <br />total <br />Total Units Proposed: 414 housing units on 15.37 acres <br />Overall Site Density: 26.95 units per acre <br /> <br />Buildings A and B, both proposed at three stories in height, are located north of the roadway that runs <br />through the site. Building C is proposed to have four stories, and fronts Kenzie Terrace, south of the <br />proposed on‐site roadway. Buildings A and B are proposed to be managed and operated by Ebenezer, a <br />senior home community. Building C is proposed to be constructed and operated by Continental Property <br />Group. The density proposed meets the Comprehensive Plan guidance for Multi‐Family Residential <br />properties. <br /> <br />Traffic, Streets and Access: The development plan proposes two main access points, one from Stinson <br />Boulevard and one from Kenzie Terrace. The roadway is included on the preliminary plat as Outlot A and <br />is proposed as private roadways. Access from the alley has been eliminated in the revised plan. A traffic <br />study was completed as a part of the Environmental Assessment Worksheet (EAW) review, and has been <br />updated. Hennepin County and the Minneapolis Park and Recreation Board (MPRB) have also reviewed <br />the proposal and have comments and requirements that will need to be met. Detailed <br />recommendations were included in that report and are incorporated here by reference. Notably, an <br />access easement is requested along the southwest corner of the property to accommodate eventual re‐ <br />location of driveways away from the Lowry/Stinson intersection. It should be noted that city <br />requirements regarding access will match the permits issued by other agencies, since the MPRB and <br />Hennepin County have jurisdiction over these roads. <br /> <br />Parking: There are 693 total parking stalls proposed for this development. The table below summarizes <br />the parking type, stalls and area associated with each segment of the proposed development. The <br />parking proposal meets city code standards. An additional 37 “proof of parking” stalls are proposed, to <br />serve as additional parking, if needed. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Landscaping: The plan provides a landscaping program exhibit as well and cross sections and the <br />separation of development from existing structures. Some trees are proposed to remain, especially <br />those along the property borders. No trees will be removed that exist on the Kenzington property or <br />Site Element Enclosed Parking <br />Stalls <br />Surface <br />Parking Stalls <br />Stalls per <br />unit <br />Building A 92 (underground) 34 2.06 <br />Building B 77 (underground) 34 0.87 <br />Building C 238 (underground) 218 2.03 <br /> <br />TOTAL 407 stalls 286 stalls 693 total
The URL can be used to link to this page
Your browser does not support the video tag.