My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 18-030 APPROVING THE PUD PRELIMINARY DEVELOPMENT PLAN/PUD REZONING, AND PRELIMINARY PLAT RELATED TO THE VILLAGE, LLC PROJECT LOCATED AT 2501 LOWRY AVENUE
StAnthony
>
City Council
>
City Council Resolutions
>
2018
>
RES 18-030 APPROVING THE PUD PRELIMINARY DEVELOPMENT PLAN/PUD REZONING, AND PRELIMINARY PLAT RELATED TO THE VILLAGE, LLC PROJECT LOCATED AT 2501 LOWRY AVENUE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 9:04:09 AM
Creation date
4/4/2018 9:04:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of St. Anthony Village <br />approves the Applications, with the following contingencies: <br />♦ Setback from Kensington Condos. Increase the setback from the property line by <br />approximately 20 feet, shifting the development to the west. <br />♦ Vacation of Easement. There is currently a watermain easement through the site, which <br />will need to be vacated through a separate action accompanying a final plat. <br />♦ Eng_neering Comments. The full City Engineer memo and stormwater management <br />memo are available as attachments and all changes should be made, per the memo to the <br />satisfaction of the city engineer. <br />♦ <br />Agency Comments. Park Board and Hennepin County permits shall be obtained and <br />permit requirements should be incorporated, as final approval by those agencies requires. <br />♦ Revised Tra :c Stzuly Recommendations. All traffic mitigation efforts listed in the <br />revised traffic study shall be part of the conditions for approval, as permitted by other <br />regulating agencies (Park Board and Hennepin County). <br />♦ Receipt ofAll Applicable Permits. All other agency permits shall be obtained, and plans <br />approved prior to construction on the site; <br />And based on a review of the complete record and the findings contained in this Resolution which <br />include: <br />(1) The use districts are protected by the Application; <br />(2) Orderly development and redevelopment is promoted by this Application; <br />(3) The proposal does provide adequate light, air, and access to property; <br />(4) The proposal prevents overcrowding of land and undue concentration of structures by regulating <br />land, buildings, yards, and densities; and <br />(5) The Rezoning Request/Planned Unit Development Preliminary Development Plan request and the <br />Preliminary Plat are consistent with the Comprehensive Plan. <br />Adopted this 27th day March, 2018. <br />ATTEST: <br />Nic7ol& Miller, City Clerk <br />Reviewed for administration: <br />erome O. Faust, Mayor <br />lIza <br />ark Casey, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.