Laserfiche WebLink
Table 2 – Project Budget Summary <br />Budget items Expected <br />costs <br />DEED <br />eligible <br />costs <br />Met Council <br />eligible <br />costs <br />Match <br />costs <br />ERF <br />eligible <br />costs <br />1) Past environmental investigation <br />Incurred investigation costs (not requested for grant <br />reimbursement) <br />1) Total past environmental costs $0 <br />2) Soil remediation and dewatering <br />Site work (mobilization, contractor’s Health and Safety <br />Plan) $13,400 $9,112 $1,608 $2,680 <br />Contaminated soil excavation and loading (2,000 CY @ <br />$8/CY), and T&D (2,800 ton @ $30/TON) $100,000 $68,000 $12,000 $20,000 <br />Contaminated soil stockpile management and backfill of <br />Hot Spots (2,000 CY @ $15/CY) $33,000 $22,440 $3,960 $6,600 <br />Active venting system (sand/rock layer, perforated piping, <br />riser piping & appurtenances, fans/turbines) $93,600 $63,648 $11,232 $18,720 <br />Field oversight during contaminated soil removal (1 WK @ <br />$4,500/WK) $4,500 $3,060 $540 $900 <br />Engineering, analytical, project management, reporting, <br />MPCA oversight, waste profile $37,400 $25,400 $4,600 $7,400 <br />Field oversight for venting system, venting system testing $13,500 $9,180 $1,620 $2,700 <br />Design and pre-construction investigation $9,500 $6,460 $1,140 $1,900 <br />Dewatering management and discharge, engineering for <br />dewatering discharge, reporting, sampling for dewatering $17,500 $11,900 $2,100 $3,500 <br />2) Total soil remediation and dewatering $322,400 <br /> <br />Total project budget (items 1, 2, & 3) $322,400 <br />Total project funding sources breakdown <br />Hennepin County $64,400 <br />DEED $219,200 <br />Local match (12% of DEED Eligible costs) $38,800 <br />Total for all funding sources $322,400 $219,200 $38,800 $64,400 <br />87