Laserfiche WebLink
St. Anthony 2040 Comprehensive Plan Chapter 6: Transportation <br /> <br />81 <br /> <br />installation of any mitigation measures recommended by a Traffic Impact <br />Study. <br />• The County Engineer may require dedication of access control over the <br />remainder of a parcel as a condition of granting access in a particular <br />location. <br /> <br />It should be noted that there are existing access points within the City that do not <br />meet Hennepin County access spacing guidelines or are inconsistent with Ramsey <br />County’s draft access management policies. In many cases these access points <br />were established prior to agency access spacing guidelines/policies. In other <br />cases, the agency has granted an exception to the existing guidelines. As <br />roadways are reconstructed and as development or redevelopment occurs, each <br />of these agencies generally works to modify and/or relocate access points that do <br />not meet current access spacing guidelines, recognizing that this may not be <br />feasible in all instances. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />