My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05222018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 05222018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 9:14:17 AM
Creation date
5/18/2018 11:21:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
St. Anthony 2040 Comprehensive Plan Chapter 6: Transportation <br /> <br /> <br />112 <br /> <br /> <br />Location Type of <br />Improvement Strategy Map <br />Reference Lead Agency(ies) Goal(s) <br /> <br /> <br />St. Anthony <br />Blvd. & New <br />Brighton Blvd. <br /> <br /> <br /> <br /> <br />St. Anthony <br />Blvd. & New <br />Brighton Blvd. <br /> <br /> <br />St. Anthony <br />Blvd. & New <br />Brighton Blvd. <br /> <br /> <br />Driveway <br />Access to <br />Stinson Parkway <br />at Southern <br />Gateway <br /> <br /> <br />Safety/Operations <br /> <br /> <br /> <br />Safety/Operations <br /> <br /> <br /> <br /> <br /> <br /> <br />Safety/Operations <br /> <br /> <br /> <br /> <br />Safety/Operations <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />improvements at St. Anthony Blvd./Silver <br />Lake Rd./Kenzie Terrace (CR 153). <br /> <br />Per Southern Gateway Traffic Study <br />(2/19/18): <br />2019 recommendation to optimize the <br />signal time and coordination between St. <br />Anthony Blvd. intersections at New Brighton <br />Blvd. (CR 88) and Silver Lake Road/Kenzie <br />Terrace (CR 153). <br /> <br />Per Southern Gateway Traffic Study <br />(2/19/18): <br />2019 recommendation to lengthen the <br />northwest bound left turn lane from St. <br />Anthony Blvd. to southbound New Brighton <br />Blvd (CR 88) from 125 feet to 225 feet. <br />Per Southern Gateway Traffic Study <br />(2/19/18): <br />2030 recommendation to consider a <br />roundabout or other intersection control <br />improvements at St. Anthony Blvd. & New <br />Brighton Blvd (CR 88). <br /> <br /> <br /> <br />Figure 14, <br />#10 <br /> <br /> <br /> <br /> <br />Figure 14, <br />#11 <br /> <br /> <br /> <br /> <br /> <br />Figure 14, <br />#11 <br /> <br /> <br /> <br />Figure 14, <br />#11 <br /> <br /> <br /> <br /> <br /> <br /> <br />Village <br /> <br /> <br /> <br />Hennepin <br />County/St. Anthony <br />Village <br /> <br /> <br /> <br /> <br />Hennepin <br />County/St. Anthony <br />Village <br /> <br /> <br /> <br />Hennepin <br />County/St. Anthony <br />Village <br /> <br /> <br /> <br /> <br /> <br />Hennepin <br />County/St. Anthony <br /> <br /> <br /> <br />8, 9 <br /> <br /> <br /> <br />8, 9 <br /> <br /> <br />3, 8, 9 <br /> <br /> <br /> <br /> <br />9
The URL can be used to link to this page
Your browser does not support the video tag.