Laserfiche WebLink
1.Develop Concept Design Features <br />2.Data Collection & Field Survey <br />3.Soils Analysis <br />4.Update Existing Conditions Model <br />5.Hydrologic & Hydraulic Analysis <br />6.Water Quality Analysis <br />7.Develop Cost Estimates <br />8.Regulatory Coordination <br />9.Develop Recommendations <br />10.Prepare Final Phase 2 Report <br />Draft Phase 2 Scope of Work <br />Significant City <br />Staff Input Needed <br />Project ID Proposed Projects <br />RCD2-1 Increase Culvert Capacity at 10th St NW and I-694 <br />RCD2-2 Detention Basin North of 5th Street <br />RCD2-3 Increase 4th Street Storm Sewer Capacity <br />RCD2-4 Pike Lake Channel Modification <br />RCD2-5 Modify Jones Lake Outlet and Dredging <br />RCD2-6 Remmele Culvert Modification <br />RCD2-7 Increase Storm Sewer Capacity on RCD 3 & RCD 2 BR 1 –both <br />outlets of Poplar Lake <br />RCD2-8 Upper (South) Hansen Park –Added after Phase 1 <br />RCD3-1 Old Historic RCD 2 Branch 1 Alignment (Detention) <br />RCD3-2 Increase RCD 3 Storm Sewer Capacity <br />RCD3-3 Floodproofing of Individual Homes (in the vicinity of <br />39th Street and Shamrock Drive) <br />RCD3-4 Silver Lake Outlet Modification <br />RCD3-5 Route Stormwater from CR D and Foss Rd through Mirror Lake <br />RCD5-2 Twin Lakes I-35W Interchange Ramp and I-35W/Cleveland <br />Avenue Intersection Improvements <br />RCD5-3 Railroad Open Channel Maintenance <br />RCD5-4 St. Croix Lift Station Improvements <br />RCD5-5 Wilson Lake –Added after Phase 1 <br />RCD5-6 MN Transfer Railway Pond –Added after Phase 1 <br />Proposed Projects to be Studied <br />Projects <br />located <br />in Saint <br />Anthony <br />in red <br />58