My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09112018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 09112018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 8:15:02 AM
Creation date
9/6/2018 3:30:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. R-011648-000 PAGE 10 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.48 million for improvements <br />identified in Option 1 and approximately $1.37 million for improvements identified in <br />Option 2. <br /> <br />Due to the poor structural condition of portions of the street sections, the deterioration of <br />the existing sanitary sewer system and frequent water main breaks, this project is both <br />feasible and necessary from an engineering standpoint. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and <br />cost effective from an engineering standpoint. We recommend reconstruction of the <br />sanitary sewer, water main, stormwater collection system, and the street as detailed in this <br />report. <br />150
The URL can be used to link to this page
Your browser does not support the video tag.