My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09112018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 09112018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 8:15:02 AM
Creation date
9/6/2018 3:30:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 and 2020 Street and Utility Improvement Project Feasibility Report <br />August 31, 2018 <br />Page 2 <br /> <br />K:\011648-000\Admin\Resolutions\LTR-hmcc-083118.docx <br />Alternate improvements for City Council consideration in either 2019 or 2020 include the <br />following: <br /> <br />• County Road C Improvements - cooperative project with Ramsey County and Hennepin <br />County <br />• Bituminous trail extension through the cemetery from County Road C (29th Avenue <br />NE) to the south existing bituminous trail <br />• Highway 88 turn lane improvements <br /> <br />• Bituminous mill and overlay improvements along the following streets: <br />• Silver Lane from Stinson Boulevard to Silver Lake Road <br />• Silver Lake Terrace from Silver Lane to the north cul-de-sac <br /> <br />Attached for your consideration is a resolution accepting the feasibility report and authorizing preparation <br />of final plans and specifications for the 2019 improvements to consist of the following: <br /> <br />• Flood improvements on Silver Lake Road from approximately 250 feet south of Silver <br />Lane to approximately 600 feet north of Silver Lane. Cooperative project with Ramsey <br />County, Rice Creek Watershed Management Organization and Minnesota Department of <br />Natural Resources. <br /> <br />• County Road C Improvements - cooperative project with Ramsey County, Hennepin <br />County and Mississippi Watershed Management Organization. <br />• Bituminous trail improvements <br />• Concrete sidewalk improvements <br />• Watermain, sanitary sewer, and storm sewer improvements <br />• Industrial Park drainage and flood improvements <br />• Bituminous trail extension through the cemetery from County Road C (29th Avenue <br />NE) to the south existing bituminous trail <br />• Highway 88 turn lane improvements <br /> <br />• Flashing Yellow Left Turn Signal improvements at the intersection of Silver Lake Road <br />and 33rd Avenue NE <br /> <br />• Bituminous mill and overlay improvements along the following streets: <br />• Silver Lane from Stinson Boulevard to Silver Lake Road <br />• Silver Lake Terrace from Silver Lane to the north cul-de-sac <br /> <br />I will be available to answer your questions at your September 11, 2018, Council Meeting, or you may call <br />me at (763) 287-7182. <br /> <br />Sincerely, <br /> <br />WSB & Associates, Inc. <br /> <br /> <br /> <br />Todd E. Hubmer, PE <br />City Engineer <br /> <br />Attachments <br />88
The URL can be used to link to this page
Your browser does not support the video tag.