<br />
<br />BUILDING PERMIT Total Valuation
<br />$1 to $500 $29.50
<br />$501 to $2,000 $28 for the first $500 plus $3.70/additional $100 or
<br />fraction thereof, to including $2,000
<br />$2,001 to $25,000 $83.50 for the first $2,000 plus $16.55/additional
<br />$1,000 or fraction thereof, to including $25,000
<br />$25,001 to $50,000 $464.15 for the first $25,000 plus $12.00/additional
<br />$1,000 or fraction thereof, to including $50,000
<br />$50,001 to $100,000 $764.15 for the first $50,000 plus $8.45/additional
<br />$1,000 or fraction thereof, to including $100,000
<br />$100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75/additional
<br />$1,000 or fraction thereof, to including $500,000
<br />$500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50/additional
<br />$1,000 or fraction thereof, to including $1,000,000
<br />$1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50/additional
<br />$1,000 or fraction thereof
<br />Inspections outside of normal business hours
<br />(minimum charge, 2 hours)
<br />$65.0063.25 per hour
<br />Reinspection; fees assessed under provisions of §32.08 $65.0063.25 per hour
<br />Inspections for which no fee is specifically indicated
<br />(minimum charge, 1/2 hour)
<br />$65.0063.25 per hour
<br />Additional plan review required by changes, additions,
<br />or revisions to plans (minimum charge, 1/2 hour)
<br />$65.0063.25 per hour
<br />For use of outside consultants for plan checking and
<br />inspections, or both
<br />Actual costs**
<br />NOTES TO TABLE:
<br />* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,
<br />overhead, equipment, hourly wages, and fringe benefits of the employees involved.
<br />** Actual costs include administrative and overhead costs.
<br />A plan review fee of 65% of the permit fee will be charged for building permits which require the submittal of
<br />plans. Fees for similar plans will be charged in accordance with provisions of Minn. Rules, Chapter 1300.0160,
<br />subd. 5.
<br />
<br />ELECTRICAL PERMITS
<br />Purpose of Fee:
<br />
<br />Residential or Commercial
<br />Building or Garage Electrical panel
<br />change out, repair or service
<br />upgrade, new panel replacement is
<br />$100.00
<br />Up to 300 amps $50.00
<br />400 amps $58.00
<br />For each additional 100 amps add $14.00
<br />Reconnected circuits Charge for each $3.00
<br />Residential or Commercial
<br />Building or Garage New circuits or
<br />reconnected circuits spliced outside
<br />of electric panel are at full fee
<br />Charge for each up to 30 amps $8.00
<br />Charge for each up to 100 amps $10.00
<br />For each additional 100 amps add $5.00
<br />
<br />New Home
<br />
<br />New Single Family Residence or
<br />Building Remodel up to 200 amps
<br />and 30 circuits used or less -
<br />includes a maximum of 3
<br />inspection trips (There is no
<br />maximum fee if the service is larger
<br />than 200 amps)
<br />
<br />$150.00
<br />24
|