My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11272018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 11272018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 8:37:57 AM
Creation date
11/21/2018 3:44:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/28/2018 <br />2 <br />Need for Project <br />Replace aging concrete pavement <br />Original construction –1979 <br />Bituminous overlay –2014 <br />Provide Pedestrian and Bike connection <br />Improve traffic operations <br />Long delays and back-ups for traffic turning east from southbound Long <br />Lake Road to County Road C <br />Some delays/turning difficulty at Walnut Street intersection <br />County Road C Reconstruction Project <br />County Road C Reconstruction Project <br />Public Involvement <br />Public meetings <br />Two in December 2017 <br />One in August 2018 <br />Major issues identified by public: <br />Lack of adequate pedestrian facilities along corridor <br />Important truck access route for I-35W and Highway 88 <br />Need wide lanes for trucks
The URL can be used to link to this page
Your browser does not support the video tag.