My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11272018
StAnthony
>
City Council
>
City Council Packets
>
2018
>
CC PACKET 11272018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 8:37:57 AM
Creation date
11/21/2018 3:44:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/28/2018 <br />4 <br />County Road C Reconstruction Project <br />New paved <br />trail <br />8-foot wide paved trail with <br />minimum 2-foot wide safety <br />shoulders <br />Extends from Highway 88 to <br />Long Lake Road <br />Typically has 5-foot wide grass <br />boulevard between trail and <br />CRC curb line <br />Eliminated truck stopping lanes <br />allow trail to pass along north <br />side of transmission tower <br />County Road C Reconstruction Project <br />Walnut Street <br />Intersection <br />Traffic analysis showed capacity <br />issues for turning movement <br />from NB Walnut Street to WB <br />CRC <br />Southbound through lane will <br />be converted to second left <br />turn lane <br />Traffic signal will be <br />reconstructed with ADA <br />upgrades
The URL can be used to link to this page
Your browser does not support the video tag.