My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01292019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 01292019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 2:49:37 PM
Creation date
1/23/2019 2:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />33RD AVE SE <br />This route will provide access to Bridal Veil Wetland, Bridal <br />Veil Creek, and enhance access to the Mississippi River. The <br />proposed regional trail would restore historic natural features <br />such as wetlands and ponds in parks and green spaces to <br />this area that requires additional environmental analysis <br />to assess a necessary mitigation efforts. This route would <br />involve several acquisitions or easements along the 33rd Ave <br />SE corridor south of Como Ave. SE [See GRML Easements & <br />Acquistions, Figures 25 and 26]. The segment south of Como <br />Avenue could be regional trail only, rather than a route for all <br />modes. Cars and freight could take alternate routes including <br />Kasota and reconnect to the GRML at Como Avenue and 33rd <br />Ave SE. <br /> <br />SECTION F: 33rd Ave SE (between Como Ave SE and Weeks Ave SE) (60’ Existing ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’6’4’5’8’10’11’10’ <br />BOULE- <br />VARD <br />BOULE- <br />VARDSIDEWALK SIDEWALKTRAILPARKINGLANELANEPROPOSED <br />EXISTING <br />8’8’11’11’11’11’ <br />SIDEWALK SIDEWALKLANELANELANELANE <br />CL <br />CL <br />SECTION F: 33rd Ave SE (between Como Ave SE and Weeks Ave SE) (60’ Existing ROW) <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’6’4’5’8’10’11’10’ <br />BOULE- <br />VARD <br />BOULE- <br />VARDSIDEWALK SIDEWALKTRAILPARKINGLANELANEPROPOSED <br />EXISTING <br />8’8’11’11’11’11’ <br />SIDEWALK SIDEWALKLANELANELANELANE <br />CL <br />CL <br />SECTION F: 33RD AVE SE (BETWEEN COMO AVE SE AND WEEKS AVE SE) (60’ EXISTING ROW) <br />PROPOSED <br />EXISTING <br />SECTION KEY <br />F F <br />K <br />A <br />SO <br />T <br />A <br /> <br />A <br />V <br />E <br /> <br />S <br />E 33RD AVE SE269
The URL can be used to link to this page
Your browser does not support the video tag.