Laserfiche WebLink
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE E - WATER SYSTEM IMPROVEMENTS <br />137 2104.502 REMOVE GATE VALVE & BOX EACH $200.00 6 $1,200.00 <br />138 2104.503 REMOVE WATER MAIN L F $5.00 1,300 $6,500.00 <br />139 2104.509 REMOVE WATER SERVICE AND CURB BOX EACH $100.00 22 $2,200.00 <br />140 2104.509 REMOVE HYDRANT AND VALVE EACH $350.00 3 $1,050.00 <br />141 2451.507 COARSE AGGREGATE BEDDING (LV)C Y $40.00 95 $3,800.00 <br />142 2504.601 TEMPORARY WATER SERVICE L S $10,000.00 1 $10,000.00 <br />143 2504.602 CONNECT TO EXISTING WATER SERVICE EACH $250.00 22 $5,500.00 <br />144 2504.602 CONNECT TO EXISTING WATER MAIN EACH $2,000.00 5 $10,000.00 <br />145 2504.602 1" CORPORATION STOP EACH $250.00 22 $5,500.00 <br />146 2504.602 8" GATE VALVE AND BOX EACH $2,200.00 6 $13,200.00 <br />147 2504.602 1" CURB STOP & BOX EACH $300.00 22 $6,600.00 <br />148 2504.602 HYDRANT ASSEMBLY EACH $5,500.00 4 $22,000.00 <br />149 2504.603 1" TYPE K COPPER PIPE L F $32.00 700 $22,400.00 <br />150 2504.603 6" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP L F $48.00 60 $2,880.00 <br />151 2504.603 8" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP L F $52.00 1,300 $67,600.00 <br />152 2504.604 4" POLYSTYRENE INSULATION S Y $45.00 100 $4,500.00 <br />153 2504.608 DUCTILE IRON FITTINGS POUND $5.00 800 $4,000.00 <br />$188,930.00 <br />$18,893.00 <br />$207,823.00 <br />$51,955.75 <br />$259,778.75 <br />OPINION OF PROBABLE COSTS <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. R-011648-000 <br />ST ANTHONY, MN <br />APRIL 9, 2019 <br />TOTAL SCHEDULE E - WATER SYSTEM IMPROVEMENTS <br />32ND AVENUE AND CROFT DRIVE <br />SUBTOTAL SCHEDULE E - WATER SYSTEM IMPROVEMENTS <br />+ 10% CONTINGENCIES <br />SUBTOTAL SCHEDULE E - WATER SYSTEM IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />124