My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04092019
StAnthony
>
City Council
>
City Council Packets
>
2019
>
CC PACKET 04092019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 8:52:44 AM
Creation date
4/5/2019 8:49:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 STREET AND UTILITY IMPROVEMENT PROJECT <br />TABLE OF CONTENTS <br />2019 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. R-011648-000 <br />TITLE SHEET <br />CERTIFICATION SHEET <br />TABLE OF CONTENTS <br />1. EXECUTIVE SUMMARY .................................................................................................1 <br />2. INTRODUCTION ...............................................................................................................2 <br />2.1 Authorization ..........................................................................................................2 <br />2.2 Scope ......................................................................................................................2 <br />2.3 Data Available........................................................................................................2 <br />2.4 Project Location .....................................................................................................2 <br />2.5 Project History .......................................................................................................3 <br />3. PROPOSED IMPROVEMENTS .....................................................................................4 <br />3.1 Silver Lake Road Flood Mitigation Improvements ...........................................4 <br />3.2 County Road C (29th Avenue NE) Improvements ............................................4 <br />3.3 Silver Lake Road and 33rd Avenue NE Intersection Signal Improvements .6 <br />3.4 Alternate Improvements .......................................................................................6 <br />3.5 Permits and Approvals .........................................................................................7 <br />4. FINANCING .......................................................................................................................8 <br />4.1 Opinion of Probable Construction Cost .............................................................8 <br />4.2 Funding Sources ...................................................................................................9 <br />5. PROJECT SCHEDULE ..................................................................................................11 <br />6. FEASIBILITY AND RECOMMENDATION ..................................................................12 <br />APPENDICES <br />Appendix A – Figures <br />Appendix B – Cost Tables <br />Appendix C – Proposed County Road C (29th Avenue NE) Improvements <br />62
The URL can be used to link to this page
Your browser does not support the video tag.