Laserfiche WebLink
""""""""") <br />")") <br />")") <br />") <br />!(!( <br />!( <br />"""" <br />"" <br />& <br />^ <br />& <br />New 36" RCP Trunk Storm <br />Existing 66" RCP Trunk Storm Main <br />36" RCPSILVER LNPENROD LNSILVER LAKE RDMACALASTER DRSILVER LAKE CTSILVER LAKE RD"Proposed CB <br />^Headwall <br />&Proposed MH <br />Proposed Storm <br />!(ExistingManholes <br />")ExistingCatchbasin <br />"Existing Gravity Mains <br />¯Figure 2 - Silver Lake Road Flood and Drainage <br />Improvements 2019 Street and Utility Improvement Project St. Anthony, MN Document Path: K:\011648-000\GIS\Maps\Feasibility Figures\Figure1_SilverLkRd_Storm_Proposed.mxd Date Saved: 8/13/2018 1:54:08 PM1 inch = 200 feet <br />WSB Project #: 011648-000 <br />200 Feet <br />77