My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 05202019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 05202019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:36:43 AM
Creation date
5/9/2019 9:36:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SILVER LAKE RD37TH AVE NE <br />29TH AVE N E <br />37TH AVE N E <br />33RD AVE N E <br />36TH AVE N E <br />31ST AVE N E <br />HIGHWAY NO 88STINSON BLVD N ES <br />T <br />A <br />N <br />T <br />H <br />O <br />N <br />Y <br /> <br />B <br />L <br />V <br />DBELDEN DRFOSS RD39TH AVE NE <br />32ND AVE N EEDWARD ST N EOLD HWY 8KENZIE TERSILVER LN <br />RANKIN RDHIGHCREST RDH C R R A C O R R I D O R <br />30TH AVE N E <br />34TH AVE N E <br />TOW NVIEW AVE <br />ASH <br />35TH AVE N E <br />PAH L AVEHARDING ST N EHILLDALE AVE N E <br />27TH AVE N EWILSON ST N ESKYCROFT DRCOOLIDGE ST N ECROFT DRARMOUR TER W <br />MURRAY AVE <br />ELMSTINSON BLVD NEPENROD LNSTINSON PKWY N EMACALASTER DRCHANDLER DRFORDHAM DRP IN E CRESTVIEW DRSHAMROCK DREDGEMERE AVE <br />DOWNERS DR <br />G U M <br />38TH AVE NE <br />WEND HURST AVE <br />ROOSEVELT ST N EANTHONY LAA N T H O N Y L A S <br />SKYCROFT CIR <br />WALNUT STSILVER LAKE CT34TH AVE N <br />SILVE <br />R LA <br />KE TER SILVER LNSILVER LAKE RDKENZIE TERROOSEVELT ST N ESKYCROFT DRSILVER LAKE RDCOOLIDGE ST N EHIGHCREST RDCROFT DRROOSEVELT ST N E0 0.25 0.50.125 Miles ¯ <br />4. Car Wash Site Po ten tia l Future R edevelopment Opportunity <br />10. Southern Gatew ay Redevelopment App roval of 430 Units <br />18. Industrial Park Future Redevelopment Future Op portunities for Redeve lopm ent <br />17. Ramse y C ounty Recon Project 2019 Coo rdination with Henne pin County Address- Flo odin g/Traffic Safety <br />24. Splas h pad re-use 20 18 Project <br /> 27 . Mirror La ke Flooding RCWD Clean Water Fund Grant Comple ted 2018 <br />14. Future MPRB Trail Henne pin County Bike Plan <br />20. Pede stria n/Bike Improvement <br />8. 29th a nd Silver Lake Road Intersection <br />11 . Former Bowling Alley SiteFuture Rede ve lopment Opportunity <br /> 31 . LED Lighting- 2018-2019 <br />Coordin ation with Hennepin County <br /> 1. Silver La ke Terrace 2 020 Rec onstruction <br />3. Gas Station Pote ntial Future R ede velopment opportunity <br />2. Silver La ne 2021 Mill/Overlay <br />6. Re-guide to Medium D ens ity Residential <br />19. Re-guide to Light Industrial <br /> 26 . Re-guide to Medium Density R esidential <br /> 28 . Re-guide to Light Industrial <br />Tour of the City - May, 2019 <br />29. Flooding Areas Continu ed co ordination with Ramsey C ounty <br />Document Path: J:\gis\city\STA\Maps\CityTour2019.m xd <br />23. Trail Low Spot <br />13. Future Redevelopment Are a- Medium Density <br />16. Industrial Park Flood Improvement Project 2019 Con struction of Stormwater ponding on easem ent <br /> 25 . 2018 Stree t Project (Hig hcrest, Foss, Macalaster) <br />15. Commerc ial Development Opportunity <br />9. Potential Park <br />7. Future MPRB Trail H ennepin County Bike Plan <br />21. 20 20 Street and Utility Improvements <br />12. Breme r Bank Future Rede velop ment Opportunity <br />22. Signal - 2 019 Project <br /> 30 . Silver Lake Roa d Flood Reduction 2019 Project <br />5. Vaca nt Lot/ R ecent Combination Future Rede velopm ent
The URL can be used to link to this page
Your browser does not support the video tag.