Laserfiche WebLink
CORNER LOTS WITH <br />CURVES <br />Front footage is determined for <br />corner lots with curves as in <br />standard comer lots, with %2 of the <br />curve length applied to the short <br />side of the lot and %2 of the curve <br />length applied to the long side of <br />the lot. See Figure 5. <br />DOUBLE FRONTAGE LOTS <br />Front footage is determined <br />similar to a corner lot. Work on <br />one street is assessed full length <br />while the other street is assessed <br />1/3 of its length. In cases where <br />the double frontage includes an <br />alley, the street side shall be <br />assessed the full length, and the <br />alley side shall be assessed the 1/3 <br />length. See Figure 6. <br />LOTS WITH CURVES <br />1/2 OF CURVE LENGTH IS APPLIED TO STREET <br />1/2 OF CURVE LENGTH IS APPLIED TO AVENUE <br />STREET <br />CURVE - <br />4712• <br />w <br />z <br />Z P <br />w <br />a <br />EXAMPLE <br />1. STREET LENGTH - 30 + 47.12/2 - 53.96 Fr <br />2. AVENUE LENGTH - 90 + 47.12/2 - 116.56 FT <br />THE STANDARD ASSESSMENT IS THEN APPLIED TO <br />THESE LENGTHS. <br />Figure 5 <br />DOUBLE FRONTAGE LOT <br />ASSESSABLE FOOTAGE - <br />SIREET A FOOTAGE + 1/3 STREET B FOOTAGE <br />STREET A <br />6B• <br />60' <br />STREET B / ALLEY <br />EXAMPLE <br />1. WORK ON STREET A <br />ASSESSABLE FOOTAGE - 60 Fr. <br />2. WORK ON STREET R / AUV <br />ASSESSABLE FOOTAGE - 60/3 Fr. - 20 Fr <br />3. WORK ON BOTH STREETS <br />ASSESSABLE FOOTAGE - 60 + 20 Fr - 50 Fr <br />NMI <br />IF IMPROVEMENTS ARE COMPLETED ON ONLY ONE SIDE OF THE <br />LOT. THE ASSESSABLE FOOTAGE SHALL EQUAL THE FULL STREET <br />LENGTH ON THAT SIDE <br />Figure 6 <br />Page 5 <br />