My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 04121999
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
1999
>
PK PACKET 04121999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 7:56:49 AM
Creation date
8/7/2019 7:56:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I � 7 <br />3 <br />ZONE 1 Q BELOW -50 F <br />ZONE 2 Q -50 to -40 <br />ZONE 3 Q -40 to -30 <br />ZONE 4 Q -30 to -20 <br />STATE INSPECTED PLANTS GROWN WITHIN <br />ZONES 1-4 AND THE ACCEPTABLE <br />GROWING RANGE FOR A MINIMUM OF 2 <br />YEARS MAY BE USED ON ALL PROJECTS <br />UNLESS OTHERWISE SPECIFIED, <br />ZONE 5 Q -20 to -10 <br />STATE INSPECTED PLANTS GROWN WITHIN <br />ZONE 5 AND THE ACCEPTABLE <br />GROWING RANGE FOR A MINIMUM OF <br />2 YEARS ARE ALLOWED ONLY aN <br />PROJECTS WITHIN ZONE 4 IN MINNESOTA. <br />UNLESS CERTIFIED AS MINNESOTA <br />ZONE HARDY IN ZONES 3 AND 2. <br />PLANT STOCK NOT GROWN WITHIN THE <br />THE ACCEPETABLE ZONES AND GROWING <br />RANGE FOR A MINIMUM OF 2 YEARS MAY <br />BE ACCEPTED IF THE SEED SOURCE OR <br />ROOT AND GRAFT STOCK IS CERTIFIED AND <br />DOCUMENTED AS MIDWEST AND NORTHERN <br />GROWN AND MINNESOTA ZONE HARDY. <br />ACCEPTABLE GROWING RANGE FOR MIDWEST AND NORTHERN GROWN PLANT STOCK <br />SOURCE- U.S.D.A. PLANT HARDINESS ZONE MAP <br />NOTES, <br />I. SEEDLING INCLUDES DECIDUOUS AND EVERGREEN STOCK. <br />2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS <br />AS DETERMINED BY THE ENGINEER <br />3. FALL PLANTING MAY NOT BE RECOMMENDED OR ALLOWED. <br />O - INDICATES PROJECT LOCATION SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. THE <br />FOLLOWING PLANTS ARE NOT RECOMMENDED FOR FALL INSTALLATION <br />HAWTHORNE. RUSSIAN OLIVE. DOGWOOD, POPLAR. HACKBERRY, LINDEN, <br />IRONWOOD. MONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE, <br />PLUM/CHERRY, OAKS,SUMAC. <br />OPTIMUM PLANTING DATE ZONES IN MINNESOTA <br />STANDARD TREE STAKING / GUYING <br />AND PAINTING DETAIL <br />7' ROLLED STEEL 10' 2.2 LB. FLANGED - <br />POST UM/DOT 3403) CHANNEL STEEL SIGF <br />OR APPROVED EQUAL POST (Mn/DOT 3401) <br />OR APPROVED EQUAL <br />16" LONG POLYPROPYLENE OR POLYETHYLENE <br />(40 MIL) 1 1/2 " VIDE STRAPS. <br />10 GA. VIRE <br />12 GA. VIRE <br />PAINT TREE FULL CIRCUMFERENCE FROM <br />BUTTONTO FIRST MAJOR BRANCH WITH <br />APPROVED TREE PAINT <br />MULCH <br />FINISHED GRADE <br />NOTES, <br />1. STEEL POSTS TO BE NOTCHED OR DRILLED <br />TO RETAIN GUY VIRES PLACE OUTSIDE OF <br />ROOT BALL. DRIVE PLUMB REGARDLESS OF <br />GROUND SLOPE. <br />2. REQUESTS TO SUBSTITUTE RUBBER HOSE <br />AND VIRE GUYING SYSTEMS WILL NOT <br />BE APPROVED. <br />APPLICABLE TO DECIDUOUS TREES <br />OVER 4" CALIPER AND EVERGREEN <br />TREES OVER 10' IN HEIGHT ONLY <br />WHEN NECESSARY OR SPECIFIED. <br />LARGE MACHINE - TRANSPLANT TREE <br />STAKING / GUYING AND PAINTING DETAIL <br />X Y Z SUBSIDENCE OR DETERIORATION OF MULCH THROUGHOUT <br />THE CONTRACT IS ACCEPTABLE TO THE EXTENT <br />THAT THE MULCH DEPTH IS MAINTAINED AT A <br />X, MINIMUM DEPTH OF 3 INCHES AT ALL TIMES AND UPON <br />FINAL ACCEPTANCE. REPLACEMENT MULCH SHALL <br />BE REQUIRED TO PROVIDE THE MINIMUM MULCH <br />DEPTH SPECIFIED WHEN SUBSIDENCE OR LOSS IS <br />EXCESSIVE OR WHEN THE CONTRACTOR'S OPERATIONS <br />HAVE CONTAMINATED THE MULCH WITH SOIL. <br />TYPE OF PLANT <br />SPRING <br />XI <br />EDGE OF <br />BRANCHING TO <br />MRM LME <br />Y <br />DEPTH OF <br />WLLM <br />M. MAz <br />FALL <br />EVERGREEN TREES <br />VARIES <br />SEEDLING <br />DECIDUOUS <br />EVERGREEN <br />DECIDUOUS <br />EVERGREV <br />APRIL 15 <br />APRIL 21 <br />APRIL 21 <br />OCT. <br />1 <br />AUG. <br />25 <br />TO <br />TO <br />TO <br />TO <br />4" <br />TO <br />6" <br />MAY 15 <br />JUNE 1 <br />JUNE I <br />NOV. <br />1 <br />SEPT. <br />15 <br />7 <br />APRIL 14 <br />APRIL 14 <br />OCT. <br />1 <br />AUG. <br />25 <br />TORIL <br />TO <br />TO <br />TO <br />4" <br />TO <br />4" <br />MAY 15 <br />JUNE I <br />MAY 24 <br />NOV. <br />6 <br />SEPT. <br />15 <br />APRIL 1 <br />APRIL 7 <br />APRIL 7 <br />OCT, <br />10 <br />AUG. <br />25 <br />TO <br />TO <br />TO <br />TO <br />TO <br />MAY 15 <br />JUNE I <br />MAY 17 <br />NOV. <br />15 <br />SEPT. <br />15 <br />APRIL 1 <br />APRIL I <br />APRIL 1 <br />OCT, <br />15 <br />SEPT. <br />5 <br />TO <br />TO <br />TO <br />TO <br />TO <br />MAY 15 <br />MpY 25 <br />MAT IS <br />NOV. <br />20 <br />OCT. <br />I <br />NOTES, <br />I. SEEDLING INCLUDES DECIDUOUS AND EVERGREEN STOCK. <br />2. ACTUAL DATES MAY CHANGE DEPENDING UPON SEASONAL CONDITIONS <br />AS DETERMINED BY THE ENGINEER <br />3. FALL PLANTING MAY NOT BE RECOMMENDED OR ALLOWED. <br />O - INDICATES PROJECT LOCATION SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. THE <br />FOLLOWING PLANTS ARE NOT RECOMMENDED FOR FALL INSTALLATION <br />HAWTHORNE. RUSSIAN OLIVE. DOGWOOD, POPLAR. HACKBERRY, LINDEN, <br />IRONWOOD. MONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, CRABAPPLE, <br />PLUM/CHERRY, OAKS,SUMAC. <br />OPTIMUM PLANTING DATE ZONES IN MINNESOTA <br />STANDARD TREE STAKING / GUYING <br />AND PAINTING DETAIL <br />7' ROLLED STEEL 10' 2.2 LB. FLANGED - <br />POST UM/DOT 3403) CHANNEL STEEL SIGF <br />OR APPROVED EQUAL POST (Mn/DOT 3401) <br />OR APPROVED EQUAL <br />16" LONG POLYPROPYLENE OR POLYETHYLENE <br />(40 MIL) 1 1/2 " VIDE STRAPS. <br />10 GA. VIRE <br />12 GA. VIRE <br />PAINT TREE FULL CIRCUMFERENCE FROM <br />BUTTONTO FIRST MAJOR BRANCH WITH <br />APPROVED TREE PAINT <br />MULCH <br />FINISHED GRADE <br />NOTES, <br />1. STEEL POSTS TO BE NOTCHED OR DRILLED <br />TO RETAIN GUY VIRES PLACE OUTSIDE OF <br />ROOT BALL. DRIVE PLUMB REGARDLESS OF <br />GROUND SLOPE. <br />2. REQUESTS TO SUBSTITUTE RUBBER HOSE <br />AND VIRE GUYING SYSTEMS WILL NOT <br />BE APPROVED. <br />APPLICABLE TO DECIDUOUS TREES <br />OVER 4" CALIPER AND EVERGREEN <br />TREES OVER 10' IN HEIGHT ONLY <br />WHEN NECESSARY OR SPECIFIED. <br />LARGE MACHINE - TRANSPLANT TREE <br />STAKING / GUYING AND PAINTING DETAIL <br />X Y Z SUBSIDENCE OR DETERIORATION OF MULCH THROUGHOUT <br />THE CONTRACT IS ACCEPTABLE TO THE EXTENT <br />THAT THE MULCH DEPTH IS MAINTAINED AT A <br />X, MINIMUM DEPTH OF 3 INCHES AT ALL TIMES AND UPON <br />FINAL ACCEPTANCE. REPLACEMENT MULCH SHALL <br />BE REQUIRED TO PROVIDE THE MINIMUM MULCH <br />DEPTH SPECIFIED WHEN SUBSIDENCE OR LOSS IS <br />EXCESSIVE OR WHEN THE CONTRACTOR'S OPERATIONS <br />HAVE CONTAMINATED THE MULCH WITH SOIL. <br />TYPE OF PLANT <br />X <br />CENTER OF <br />PLANT TO <br />WILCH LINE <br />XI <br />EDGE OF <br />BRANCHING TO <br />MRM LME <br />Y <br />DEPTH OF <br />WLLM <br />M. MAz <br />Z <br />DEPTH OF <br />HAM <br />NIH ... <br />EVERGREEN TREES <br />VARIES <br />3' MIN. <br />4" <br />6" <br />4" <br />6" <br />DECIDUOUS TREES <br />3' MIN. <br />N/A <br />4" <br />6" <br />4" <br />6" <br />EVERGREEN SHRUBS <br />VARIES <br />3' MIN. <br />3" <br />4" <br />4" <br />6" <br />DECIDUOUS SHRUBS <br />3' MIN. <br />N/A <br />4" <br />6" <br />4" <br />6" <br />VINES <br />2' MIN. <br />N/A <br />4" <br />6" <br />4" <br />6" <br />GROUNDCOVERS <br />VARIES <br />2' MIN. <br />3" <br />4" <br />3" <br />4" <br />MACHINE -TRANSPLANTED TREES 12" BEYOND EDGE OF HOLE <br />4" <br />6" 1 <br />4" <br />6" <br />NOTE, <br />REMOVE MULCH PLACED TO A DEPTH GREATER THAN THAT SPECIFIED <br />WHEN DIRECTED BY THE ENGINEER. <br />MULCH PLACEMENT DETAIL <br />le I <br />SHEET Nj <br />7 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.