My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 02081999
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
1999
>
PK PACKET 02081999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 8:06:33 AM
Creation date
8/7/2019 8:06:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 28, 1998 <br />Silver Point Park Excavation <br />Crews from Richard Knutson, Inc. (RKI) are <br />continuing excavation work in the park. The bulk of <br />the excavation and the trucking of materials off of <br />the site should be completed by <br />December 3 V. During the month <br />of January RKI will be finishing <br />-11) the slopes, as well as working <br />_a the ball fields, trails, basketball, <br />and parking lot areas. <br />Central Park Excavation <br />Originally it had been anticipated <br />that construction in Central park <br />would begin in the spring of 1999. <br />However, with the late arrival of <br />winter we anticipate excavation to <br />begin in Central Park on Wednesday, December <br />300'. Weather permitting, the stormwater storage <br />area in the north end of the park should be <br />completed by January 15, 1999. <br />Storm Sewer Installation <br />EJM Pipe Services is in the process of tunneling a <br />pipe underneath the County Road 88 Frontage <br />Road. Schedules were upset when a mechanical <br />problem delayed the tunneling for <br />QUESTIONS? <br />Resident's Contact Person: <br />Bryon Amo <br />WSB & Associates, Inc. <br />Bryon's Cell Phone: <br />518-0482 <br />Bryon's Pager: <br />539-8601 <br />Bryon's Truck: <br />Red Mazda B2000 <br />several days and the Holidays <br />making for two short working <br />weeks. EJM anticipates completing <br />this portion of the project by the <br />week of January 11, 1999. <br />Upon completion of the tunneling, <br />RKI plans to make a pipe <br />connection at St. Anthony <br />Boulevard and complete the <br />installation of storm sewer which <br />will serve as the outlet for Silver <br />Point Park drainage. As part of this <br />activity the frontage road will again <br />be reopened and the temporary <br />access removed. Portions of the <br />frontage road will remain gravel until it is warm <br />enough to pave this spring. <br />If you have any questions or concerns about the <br />project please do not hesitate to contact Bryon <br />Amo. In the event you cannot reach Bryon Amo, <br />please call Todd Hubmer, the Project Engineer, at <br />541-4800. <br />117SB & Associates, Inc. 350 Westwood Lake Office Park Minneapolis, MN 55426 <br />(611) 541-4800 8441 Wayzata Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.