My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 02122001
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2001
>
PK PACKET 02122001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:03:40 AM
Creation date
8/7/2019 9:03:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Commission Meeting Minutes <br />January 29, 2001 <br />Page 5 <br />Mr. Hartman stated the building size will probably not exceed this threshold. The Commission <br />agreed. Mr. Kost stated their design will just identify the pad and they will bring the sewer and <br />water within five feet of the building so the building contractor can make the connection. Mr. <br />Kost stated he will prepare a site plan which Mr. Hartman can provide to the Commission. <br />Anderson suggested the subcommittee meet again to address the types of groups that will use this <br />facility, peak attendance, need for picnic tables, etc. He stated he thinks this concept may include <br />more covered space than is needed. Once those issues are identified, Ms. Olivier will be better <br />able to determine the size of building which meets that need. <br />Skrivseth reviewed the current size of programs and estimated an attendance of at least 40 <br />children. <br />Zurbey stated he thinks the size of the concession stand and bathrooms (with double vanities) is <br />too large. <br />Jindra stated she thinks there is plenty of picnic space available. Skrivseth stated the picnic areas <br />are rented out every summer weekend. <br />The Commission agreed that the shelter will not exceed 2,240 square feet. <br />Landscape Subcommittee <br />Jindra stated the Landscape Subcommittee has not yet met. <br />Field Subcommittee <br />Zurbey stated this information gives them a lot if issues to raise with the athletic director. <br />Jensen stated he has contacted a Senior Parks Designer for the City of St. Paul who deals with <br />landscaping and trails and is willing to meet with the subcommittee and provide input. <br />It was decided the Field Subcommittee would meet with this Senior Parks Designer on <br />Wednesday, January 31, 2001, and to also invite Ted Severson. <br />Mr. Kost stated the plans can be finalized on February 12th. If approved by the Commission, <br />then it will take them several weeks to complete the plans. Once the plans are approved, they <br />will go out for bids. He reviewed the other issues that they can get prices for in case the <br />Commission wants to consider it for future planning. <br />Anderson reviewed his meeting with City Staff and BRW and indication that BRW would <br />include as many bidding options as possible to allow the Commission to make those decision <br />once the bids are known. He stated they did drop the bid option for placing drain tile under the <br />fields. <br />
The URL can be used to link to this page
Your browser does not support the video tag.