My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 03082004
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2004
>
PK PACKET 03082004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 10:09:48 AM
Creation date
8/7/2019 10:09:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Infield Enlargement <br />The two westerly fields are being enlarged to accommodate 70 foot bases and the varsity field <br />adjusted the baselines and pitching mound. The work on the varsity field was done by <br />volunteers and the Cities Public Works Department. The southwest infield was enlarged by <br />City staff and some volunteers, but 2 irrigation heads still need to be adjusted. The City plans to <br />enlarge the northwest field in the spring and will have to adjust 2 more irrigation heads. <br />5. Batting Cage Erosion <br />Erosion continues to be a problem at the batting cages. There is surface water coming down the <br />path from the infield area and across the path from the extra drain tile that comes from the <br />varsity field. A number of solutions have been discussed and we have decided to add a small <br />bituminous curb along the batting cage to direct the water around the ag-lime area. <br />Any additional issues will be addressed as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.