My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08202019
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2019
>
PL PACKET 08202019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 10:31:08 AM
Creation date
8/15/2019 12:33:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 20, 2019 <br />Page 11 <br /> <br />The proposed building materials are consistent with Ordinance requirements and the color <br />scheme is considered well-conceived. <br /> <br />While graphic depictions of the apartment buildings have been provided, minimal information <br />regarding the appearance of the clubhouse and pool building have been provided. As a <br />condition of Final PUD approval, details regarding the design of the clubhouse and pool building <br />should be submitted for City review. <br /> <br />Landscaping. Appropriately, a preliminary landscape plan has been submitted for review. The <br />plan illustrates generalized tree and planting bed locations. While the tree and plant locations <br />appear acceptable, the landscape plan should be expanded to specify plant varieties and sizes. <br />This issue should be addressed as part of the City’s consideration of the Final PUD. <br /> <br />As part of the refinement of the landscape plan, it is suggested that consideration be given to <br />accentuating the primary entrance to the site with an intensified landscaping effort. <br />Consideration could be given to providing a landscape median or other enhancement near the <br />eastern entrance to the site, between the garage entrance driveways and the sidewalk crossing <br />to the east. <br /> <br />The purpose of this recommendation would be to create a more prominent sense of entry to <br />the project. While the main entry/access area inside the interior courtyard appears to be an <br />attractive space, the view of the project from Silver Lake Road is understated – little attention is <br />evident to the “front door” of the project site. Planning staff believes that an enhanced entry <br />drive would benefit the project with the objective of making a more substantial presentation to <br />the public side of the development. <br /> <br />Sidewalks, Parks, and Open Space. The submitted site plan illustrates concrete sidewalks along <br />the south, east and west sides of the site. Sidewalks are also illustrated within the interior <br />court area. Connections to the surrounding area are consistent with the existing conditions, and <br />should serve the site well. <br /> <br />The site establishes an impervious surface coverage of 75% of the development property, apart <br />from the parcel on which Salo Park is located. Current impervious on the site in in excess of <br />90% under the original Walmart use. While the resulting impervious exceeds the R-4 standard, <br />it represents a significant increase in green space over the existing condition. <br /> <br />With regard to parks, the City has determined that the original subdivision and plat of Silver <br />Lake Village, in the establishment of the park use of Salo Park, has met its park dedication <br />requirement with the initial PUD approval. <br /> <br />Lighting. To date, a lighting plan has not been submitted for review. As a condition of Final <br />PUD approval, a lighting plan should be submitted for review which demonstrates compliance <br />with City requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.