Laserfiche WebLink
7803 Glenroy Road, Suite 200 | Bloomington, MN 55439 |952.288.2000 | Fax: 952.288.2001 | www.DoranCompanies.com <br />July 22, 2019 <br />RE: PUD Amendment Project Narrative – Silver Lake Village Development – St. Anthony, MN <br />Doran Companies has under contract to purchase a 13-acre site at 3800 Silver Lake Rd NE in the City of St. <br />Anthony, for an exciting new multifamily development at Silver Lake Village (the “Project”). The lots current <br />use is a vacant Walmart and Salo Park are currently zoned as a PUD and we anticipate going through a <br />Preliminary and Final PUD Amendment process. We do not expect any physical changes to Salo Park. <br />Doran Companies takes pride in the quality of multifamily housing projects that it brings to the community. The <br />community areas and amenities are regularly second to none. This Project will be no different in either aspect. <br />State-of-the-art amenities will include a clubhouse with a full-scale fitness center, game room, business center, <br />entertainment suites, outdoor pools, spas, lounge chairs, community grills and gathering spaces. All interior unit <br />finishes will be first class with quality fixtures, flooring, finishes and countertops that are synonymous with the <br />quality of multifamily housing that Doran Companies designs, develops and constructs. In keeping with the <br />Comprehensive Plan’s maximum prescribed density of 38 du/acre for this area, which would yield a maximum <br />unit count of 494 units, the Project is expected to include approximately 460 apartment units constructed in two <br />230-unit phases. The Project will have approximately 8% studios, 3% alcoves, 52% one bedrooms, 26% two <br />bedrooms, and 11% three-bedroom units. The Project will be four stories of wood construction over one story <br />of structured parking which will be above grade to avoid conflict with the high water thresholds of Salo Park. <br />The Project site is situated along the Eastern side of Silver Lake Rd NE and bordered to the West by Salo Park, <br />the Soo Line Railway to the South, and Silver Lake Village Shopping Center to the North. Currently occupied <br />by a vacant Walmart, the surrounding area has some of the City’s most popular shopping destinations. The site <br />is also easily accessible being just 2 miles off Interstate 35W and about 6 miles North of downtown <br />Minneapolis. <br />Stormwater management for the new site will follow the current requirements and will utilize a drainage system <br />in connection with the Salo Park Stormwater Pond adjacent to the site. <br />We look forward to working with the City to further this Preliminary Development Plan submittal. <br />Sincerely, <br />Evan Doran <br />Senior Director, Development