Laserfiche WebLink
A <br />A <br />A <br />A <br />B <br />B <br />B C <br />C C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />E <br />F <br />G <br />L <br />G <br />G <br />G <br />G <br />G <br />G <br />G <br />G <br />G <br />G <br />G <br />G G <br />G <br />G <br />H <br />H <br />H <br />H <br />H <br />H <br />H <br />G <br />H <br />M <br />C <br />H <br />I <br />I <br />I <br />I <br />I <br />J <br />J <br />J <br />K <br />K K <br />K <br />K <br />K <br />K <br />KK <br />K <br />K <br />K <br />QQ <br />Q <br />Q <br />Q <br />Q <br />E E <br />P <br />P <br />P <br />RR <br />R <br />R <br />R <br />R <br />S <br />U <br />S <br />U <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />Q <br />T TTTT <br />N <br />Q <br />K <br />B <br />A <br />O O <br />C <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />T <br />I <br />CONTRACTOR SHALL REFER TO PROPOSED <br />UTILITY PLAN FOR RELOCATION. <br />CONSTRUCTION IS TO BE PHASED <br />TO HAVE PROPOSED RELOCATION <br />COMPLETE PRIOR TO DEMO. <br />CONTRACTOR SHALL REFER TO <br />GRADING AND DRAINAGE PLAN <br />FOR PROPOSED RELOCATION. <br />CONSTRUCTION IS TO BE PHASED <br />TO HAVE PROPOSED RELOCATION <br />COMPLETE PRIOR TO DEMO.PREPARED FORDEMO PLANC200SILVER LAKE VILLAGEAPARTMENTSDORANCOMPANIESST. ANTHONYMNDATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION OR REPORT WAS PREPARED BYME OR UNDER MY DIRECT SUPERVISION ANDTHAT I AM A DULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THE STATE OFMINNESOTA.MNLIC. NO.BRIAN M . WURDEMAN07/17/201953113DATECHECKED BYSCALEDESIGNED BYDRAWN BYKHA PROJECT16066501207/22/2019AS SHOWNBPGBPGBMW1.THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION <br />APPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, <br />PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC. SUCH THAT THE IMPROVEMENTS ON THE <br />PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE <br />MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE PROJECT <br />DOCUMENTS. <br />2.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE <br />DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS <br />REQUIRED FOR DEMOLITION AND DISPOSAL. CONTRACTOR SHALL PROVIDE COPIES OF THE PERMIT AND <br />RECEIPTS OF DISPOSAL OF MATERIALS TO THE OWNER AND OWNERS REPRESENTATIVE. <br />3.THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES. <br />UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE CONSTRUCTION <br />MANAGER AND COORDINATION WITH THE ADJACENT PROPERTIES AND/OR THE CITY. <br />4.THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL <br />AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY <br />CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES <br />AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE <br />CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. <br />5.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THE PLAN HAVE BEEN DETERMINED FROM THE <br />BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE <br />ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY <br />DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR LOCATIONS OF <br />EXISTING UTILITIES WITHIN ALL AREAS OF PROPOSED WORK. <br />6.ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT <br />LOCATION, OR AS ANY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND <br />PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY <br />COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES <br />BEFORE PRECEDING WITH THE WORK. <br />7.ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC, AND/OR GAS LINES NEEDING TO BE REMOVED <br />OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME <br />SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS <br />NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE <br />ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD RIGHT-OF-WAY DURING CONSTRUCTION. <br />8.CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, <br />ETC. (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY THE CONSTRUCTION <br />MANAGER. MAINTENANCE OF TRAFFIC CONTROL SHALL BE COORDINATED IN ACCORDANCE WITH ST. <br />ANTHONY, HENNEPIN COUNTY COUNTY AND MN/DOT. <br />9.CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTIES DURING CONSTRUCTION, AND <br />SHALL NOTIFY ALL PROPERTIES IF ACCESS WILL BE INTERRUPTED OR ALTERED AT ANY TIME DURING <br />CONSTRUCTION. <br />10.PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED. <br />11.CONTRACTOR MAY LIMIT SAW-CUT AND PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS <br />REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF <br />THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND <br />REPAIR. <br />12.THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE CITY WATER <br />DEPARTMENT TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION IS <br />CONSTANTLY AVAILABLE TO THE SITE THROUGHOUT THIS SPECIFIC WORK AND THROUGH ALL PHASES <br />OF CONSTRUCTION. CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED <br />WATER MAIN SHUT OFFS WITH THE CITY OF ST. ANTHONY DURING CONSTRUCTION. ANY COSTS <br />ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND NO <br />EXTRA COMPENSATION WILL BE PROVIDED. <br />13.REFER TO SURVEY FOR ALL EXISTING INVERT AND RIM ELEVATIONS. <br />14.ALL UTILITIES SHOWN ARE EXISTING UTILITIES. <br />15.IN THE EVENT A WELL IS FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER AND OWNER <br />IMMEDIATELY. ALL WELLS SHALL BE SEALED BY A LICENSED WELL CONTRACTOR IN ACCORDANCE WITH <br />ALL STATE OF MN REQUIREMENTS. <br />16.IN THE EVENT THAT UNKNOWN CONTAINERS OR TANKS ARE ENCOUNTERED, THE CONTRACTOR SHALL <br />CONTACT THE OWNER AND/OR OWNERS REPRESENTATIVE IMMEDIATELY. ALL CONTAINERS SHALL BE <br />DISPOSED OF AT A PERMITTED LANDFILL PER THE PROJECT DOCUMENTS. <br />17.CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY EXISTING DRAINTILE IS ENCOUNTERED ON SITE. NO <br />ACTIVE DRAINTILE SHALL BE REMOVED WITHOUT APPROVAL FROM THE ENGINEER. <br />DEMOLITION PLAN NOTES <br />NORTH <br />LIMITS OF CONSTRUCTION <br />REMOVE BITUMINOUS SURFACE <br />REMOVE CONCRETE SURFACE <br />REMOVE BUILDING <br />REMOVE TREE <br />REMOVE CONCRETE CURB & GUTTER <br />REMOVE UTILITY LINES <br />PROPERTY LINE <br />EXISTING CHAINLINK FENCE <br />EXISTING RETAINING WALL <br />EXISTING SANITARY SEWER <br />EXISTING STORM SEWER <br />EXISTING WATERMAIN <br />EXISTING GAS MAIN <br />EXISTING UNDERGROUND TELEPHONE <br />EXISTING CONTOUR <br />EXISTING SIGN <br />EXISTING FLARED END SECTION <br />EXISTING STORM MANHOLE <br />EXISTING STORM CATCHBASIN <br />EXISTING GAS METER <br />EXISTING POST INDICATOR VALVE <br />EXISTING WELL <br />EXISTING AUTOMATIC SPRINKLER <br />EXISTING ROOF DRAIN <br />EXISTING GATE VALVE <br />EXISTING HYDRANT <br />EXISTING METAL COVER <br />EXISTING ELECTRICAL METER <br />EXISTING AIR CONDITIONER <br />EXISTING TELEPHONE MANHOLE <br />EXISTING CABLE BOX <br />EXISTING GUY WIRE <br />EXISTING POWER POLE <br />EXISTING LIGHT POLE <br />EXISTING TREE <br />CLEARING & GRUBBING <br />FILL & ABANDON UTILITY LINES <br />EXISTING TREE LINE <br />EXISTING CURB & GUTTER <br />LEGEND <br />FULL DEPTH SAWCUT <br />KEYNOTE LEGEND <br />REMOVE EXISTING BITUMINOUS PAVEMENT <br />REMOVE EXISTING CONCRETE PAVEMENT <br />REMOVE CURB AND GUTTER <br />REMOVE EXISTING BOLLARDS <br />REMOVE EXISTING UTILITIES <br />REMOVE EXISTING BUILDING, AND ASSOCIATED <br />FOUNDATIONS/FEATURES <br />REMOVE EXISTING LIGHT POLE/POWER POLE/SIGN <br />AND ASSOCIATED FOUNDATIONS/FEATURES <br />REMOVE EXISTING SIGN <br />CLEARING AND GRUBBING <br />REMOVE EXISTING WALL <br />REMOVE STORM STRUCTURE <br />REMOVE EXISTING FLAG POLE <br />REMOVE EXISTING MAIL COLLECTION BOX <br />REMOVE EXISTING FENCE <br />SAWCUT LINE <br />REMOVE EXISTING ELECTRICAL EQUIPMENT <br />PROTECT EXISTING UTILITIES <br />PROTECT STORM STRUCTURE, ADJUST CASTING TO <br />MATCH FINISHED GRADE <br />PROTECT EXISTING HYDRANT <br />PROTECT EXISTING LIGHT POLE <br />REMOVE & REPLACE EXISTING HYDRANT <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />K <br />L <br />M <br />N <br />O <br />P <br />Q <br />R <br />S <br />T <br />U <br />PROTECT ITEM <br />This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.SHEET NUMBER 2018 KIMLEY-HORN AND ASSOCIATES, INC.767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114PHONE: 651-645-4197WWW.KIMLEY-HORN.COMK:\TWC_LDEV\DORAN COMPANIES\Silver Lake Wal-mart - St. Anthony Apartments\3 Design\CAD\PlanSheets\C2-DEMO PLAN.dwg July 29, 2019 - 3:44pm©BYREVISIONSNo.DATEPRELIMINARY - NOT FOR CONSTRUCTION