My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08202019
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2019
>
PL PACKET 08202019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 10:31:08 AM
Creation date
8/15/2019 12:33:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 20, 2019 <br />Page 2 <br /> <br /> <br />Staff believes that the flexibility requested under the PUD is appropriate, given the objectives of <br />the Comprehensive Plan and the related improvements and amenities proposed as part of the <br />project. Staff is recommending approval of the Preliminary Plan stage of the PUD Amendment <br />for Silver Lake Village, with a series of conditions as noted in the summary section below. <br />GENERAL INFORMATION <br />Applicant: Doran SLV, LLC <br />Owner: IRC Silver Lake Village, et al <br />Location: 3800 Silver Lake Road <br />Existing Land Use Vacant Retail Building and Parking Lot <br /> <br />Zoning: PUD, Silver Lake Village PUD <br /> <br />Surrounding Land North: Retail Commercial zoned Silver Lake Village PUD <br />Use / Zoning: East: Retail Pad Sites – Coffee Shop/Gas Station zoned PUD <br /> South: Railroad, then Commercial/Industrial zoned L-I, Light Industrial <br />West: Multiple Family Residential zoned PUD <br /> <br />Deadline for Agency Application Complete Date: July 29, 2019 <br />Action: 60 Days: September 27, 2019 <br />Letter Sent: NA <br /> 120 Days: November 26, 2019 <br /> <br />ANALYSIS <br />1. Background <br />The applicant is proposing to redevelop the existing Walmart site, including demolition of <br />the building and parking lot, replacing the current structure with a two-phase multiple <br />family residential project of approximately 464 dwelling units. The development parcels in <br />question are shown on the zoning map below, and are 13 acres in total area. <br />The project is proposed to be developed in two phases. The Phase 1 apartment building is <br />to be located on the northern one-half of the site and includes 230 units. The Phase 2 <br />building is to be located on the southern one-half of the site and includes 234 units. Each <br />building measures five stories in height with the ground level floor being devoted to indoor <br />parking. <br />The apartment project includes several amenities including a 9,300 square foot clubhouse <br />building within which a fitness center, game room, business center and entertainment <br />suites are to be provided. Also included amenities are an outdoor pool, two spas, <br />community grills and outdoor gathering spaces. <br />
The URL can be used to link to this page
Your browser does not support the video tag.