Laserfiche WebLink
Planning Commission Regular Meeting Minutes <br />August 20, 2019 <br />Page 2 <br /> <br />Chair Papatola reviewed how the public hearing will proceed this evening. This item will come 1 <br />before Council on September 10, 2019. 2 <br /> 3 <br />Chair Papatola opened the public hearing at 7:05 p.m. 4 <br /> 5 <br />City Planner Stephen Grittman reviewed the project for land use compliance with the intent and 6 <br />policies of the City’s Comprehensive plan, and for zoning consistency with the R-4, Multiple 7 <br />Family Residential District as a baseline. In summary, the Comprehensive Plan promotes 8 <br />redevelopment of the Walmart site as a major goal, and includes high density multiple family 9 <br />residential uses of up to 40 units per acre as allowable in this area. The applicant is seeking the 10 <br />PUD Amendment at just over 35 units per acre. The pond space in Salo Park is also included in 11 <br />the site but will not be changed. The site is 13 acres in size and currently occupied by an empty 12 <br />WalMart building. The sites were indicated on maps by Mr. Grittman. The proposed site plan 13 <br />drawing was provided. Underbuilding parking will be provided. City Planner Grittman also 14 <br />provided the grading plan, view from the south, view from the north, east elevation concept, east 15 <br />elevation perspective sketch, view of NE corner, view from Salo Park, main floor plan, and 16 <br />landscape concept architectural drawings. 17 <br /> 18 <br />City Planner Grittman noted the PUD is a three-stage process. The first stage is a joint work 19 <br />session between the Council and the Planning Commission which was held a couple months ago 20 <br />on a sketch plan. The PUD application is now at Preliminary Plan stage and includes a public 21 <br />hearing. The City Council will review the final PUD. 22 <br /> 23 <br />The proposed PUD meets the requirements of the Zoning Ordinance for the majority of the 24 <br />baseline standards. The principal areas of flexibility under the PUD include: 25 <br /> 26 <br />1. The proposal to have two principal buildings on a single development parcel. 27 <br />2. Building height (code is 35 feet/3 stories); applicant proposes approximately 52 feet and 4 28 <br />stories (5 including the exposed portion of the lower-level parking garage). 29 <br />3. Parking supply (code requires 2 per unit, total of 928); applicant proposes 813 spaces – 1.75 30 <br />per unit or 1.35 per bedroom. 31 <br />4. Lot coverage/impervious surface (R-4 code limits this to 50%); applicant’s proposal is 32 <br />approximately 75%. The current condition is 85%. 33 <br />5. Density (R-4 code limits this to approximately 24 units per acre, Comprehensive Plan calls 34 <br />for 20-40 units per acre); applicant is proposing approximately 35 units per acre. 35 <br /> 36 <br />City Planner Grittman summarized the preliminary staff comments as: 37 <br />• Land use – conversion of site from commercial to residential use. 38 <br />• Plan details – height, site planning, landscaping. 39 <br />• Building architecture – massing, orientation, materials. 40 <br />• Access and parking – adequacy, accessibility. 41 <br />• Presentation – entry, views. 42 <br /> 43 <br />City Planner Grittman stated staff believes that the flexibility requested under the PUD is 44 <br />appropriate, given the objectives of the Comprehensive Plan and the related improvements and 45