Laserfiche WebLink
Page 15 of 16 <br />DISCLAIMER: concept project information based on preliminary assumptions. Changes will occur. September 16, 2019. Trident Development LLC. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This preliminary layout is Indented to be a basic concept plan to show the size of building planned, parking <br />requirements, and the need for a drive-through. If the City desires to pursue this project, Bremer Bank will <br />engage in a detailed site planning process and make various revisions to this concept site plan (including <br />providing visual renderings). Below are notes form the recent staff meeting: <br /> <br /> The developer and Bremer recognize the need to show an east-to-west pedestrian connection; and the need to <br />dedicate the portion of property on the east side of the site for a north-to-south pedestrian connection as <br />outlined in the 2016 TAP Report. Additionally, consideration will be given to the orientation of the building—the <br />developer understands the city would like to maintain long-term development potential to the northeast, and <br />make sure the building has a good presence on Kenzie.