Laserfiche WebLink
o Public Works – Streets Division has the 1995 Front End Loader scheduled for replacement in <br />2020. <br />o Public Works – Parks Division has the 2001 Slope Mower scheduled for replacement in 2020. <br />o Administration and Finance - the creation of a small conference room was completed in 2019 <br />The Laser fiche storage of the scanned Commercial properties permitting files and the relocation <br />of account payable files emptied the space for the conference room. The paper accounts payable <br />files will be retained for the defined time required and then purged. Paper storage of vendor bills <br />was discontinued in 2019 and bills are electronically stored in the accounting software. <br />Parks Improvement Fund <br />o Central Park splash pad water reuse assessment was completed in 2017. <br />• Upon Councils’ review the re-use project was completed as part of the City’s 2018 <br />Improvement plan. <br />• The Utility Infrastructure Fund funded the project cost as the water savings will reduce <br />treatment costs for the City’s water fund. <br />o Placeholders below were added based on comments by Parks Commission and Staff. <br />• Splash Pad shade structures and seating is under review <br />• Quote for Tennis Courts resurfacing will be obtain in 2020. 2021 placeholder is a <br />preliminary estimate <br />• Hockey rink at Silver Point Park was replaced in 2018 <br /> <br />Utilities Infrastructure Fund <br />o Reznor heating units replaced in GAC plant in 2019 <br />o Foss Road Lift Station Pump Replacement/re-hab scheduled for 2020 <br />o Wellhead Protection Plan Documentation (MDHS) update due in 2020 grant of $6,000 received <br />to help offset the estimated total cost of $25,000 <br />o Funding of the Central Park splash pad water re-use completed in 2018, see Park Improvement <br />comments. <br />o The Vactor / Jetter is scheduled for replacement in 2020. The replacement is expected to have <br />sufficient power to pump out Foss lift station, current equipment cannot. A partial sharing of <br />equipment cost is being pursued with the MWMO but is not reflected as a source at this time. <br />Street Improvement and Debt Service Plan <br />o Plan reflects the 2020 street improvement schedule. <br />o Plan has updated projections for future bond interest rates. <br />Stormwater Fund <br />o Silver Lake Road Flood Mitigation project is near completion and within cost estimates. <br />• The Funding sources include the DNR – $355,000, Ramsey County - $157,000 and RCWD <br />- $50,000, BSWR - $90,000 and 2019A bond proceeds of $335,000. <br />• The project was accounted for in the 2019 Street Improvement Project fund vs the <br />Stormwater fund to comply with Bond requirements. <br />• The Industrial Park flooding project was deferred to 2020 given the reconstruction of <br />County Rd C occurring in the same area in 2019. <br />o Equipment replacement scheduled for 2020 includes: