My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 19-086 APPROVING THE 2020 FEE SCHEDULE
StAnthony
>
City Council
>
City Council Resolutions
>
2019
>
RES 19-086 APPROVING THE 2020 FEE SCHEDULE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:18:28 AM
Creation date
12/3/2019 9:11:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />7 <br /> <br /> <br />RIGHT OF WAY: <br /> Permit Amount <br /> Registration Fee $60 <br /> Excavation Permit Fee: <br /> Hole $150 <br /> Trench $70/100 lineal foot (plus hole fee) <br /> Obstruction permit base fee $50 plus $.05/lineal foot <br /> Permit Extension fee $55 <br /> Street Excavation (§150.031) $50 <br /> Small Cell Wireless ROW Rent <br />$150 per year (plus $25 per site) <br /> <br /> <br />Small Cell Wireless Monthly <br />Electrical Fee <br /> <br />Actual Cost or $73 per radio node less than or <br />equal to 100 maximum watts; <br />$182 per radio node over 100 maximum watts <br />(whichever is greater) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />UTILITIES: <br />FIRE CONTROL DEVICES: (billed quarterly) <br />Size Amount <br />2" $7.88 <br />3" $10.50 <br />4" $15.75 <br />6" $21.00 <br />8" $26.25 <br /> 10" $42.00 <br /> <br />IRRIGATION RATES: $4.08 per 1,000 gallons
The URL can be used to link to this page
Your browser does not support the video tag.