Laserfiche WebLink
THIN BRICK ON <br />ARCH PC AT LEVEL P1 <br />TYPICAL <br />THIN BRICK ON <br />ARCH PC AT LEVEL P1 <br />TYPICAL <br />ISSUE RECORD <br />No.Description Date <br />ARCHITECT: <br />7803 Glenroy Road, Suite 200 <br />Bloomington, MN 55439 <br />952-288-2000 <br />952-288-2031 fax <br />DESIGN ARCHITECT: <br />REGISTRATION <br />DATE <br />PROJECT NUMBER <br />LOCATION <br />SHEET TITLE <br />SHEET NUMBER <br />PREPARED FOR <br />7803 Glenroy Road, Suite 200 <br />Bloomington, MN 55439 <br />952-288-2000 <br />952-288-2031 fax <br />NOT FOR CONSTRUCTION <br />11/01/2019 <br />18-001 <br />Silver <br />Lake Village <br />11/01/2019 <br />BL <br />MD <br />MD <br />EXTERIOR <br />ELEVATIONS <br />RESIDENCE <br />A 3.1 <br /> 1" = 10' - 0"1 NORTH EXTERIOR ELEVATION <br /> 1" = 10' - 0"2 NORTH EXTERIOR ELEVATION CONTINUTED <br />615146 <br />19 <br />13 <br />15 <br />24 <br />15 <br />723 <br />LEVEL P1 <br />ENTRANCE 12'-0"10'-6"10'-6"10'-6"10'-6"LEVEL P1 <br />LEVEL 1 <br />LEVEL 2 <br />LEVEL 3 <br />LEVEL 4 <br />ROOF <br />12'-0"10'-6"10'-6"10'-6"10'-6"LEVEL P1 <br />LEVEL 1 <br />LEVEL 2 <br />LEVEL 3 <br />LEVEL 4 <br />ROOF <br />GARAGE <br />ENTRANCE MATCH LINEMATCH LINE58'-9"5 12 <br />RETURNS AT SOFFIT, <br />AND WALL <br />10 <br />25 <br />13 <br />19 <br />2 <br />5 <br />1 <br />11 9 6 23 1 24 4 23 19 18 12 <br />115293013 <br />15124235 4 <br />15146 <br />19 <br />13 <br />24 23 5 <br />RETURNS AT SOFFIT, <br />AND WALL <br />15 <br />5 18 <br />16 <br />11 9 6 23 1 24 <br />4 15 <br />12 12 <br />241 <br />PLANTER <br />7 <br />9 <br />19 <br />7 <br />9 <br />@ SOFFIT <br />@ SOFFIT <br />26 5 <br />2 <br />26 5 <br />2 <br />18 <br />18 <br />21 <br />3 <br />14 <br />RAILING RETURNS TO PROTECT METAL PANEL <br />RAILING RETURNS TO <br />PROTECT METAL PANEL <br />7 <br />14 2930 <br />7 49 7 18 <br />MONUMENT <br />SIGN <br />14 15 <br />4 23 19 9 <br />1 <br />1 FACE BRICK 1 (RED BLEND TBD) <br />FACE BRICK 2 (DARK BLEND TBD) <br />ARCH EXT PNL 1 (COLOR 1 TBD) <br />ARCH EXT PNL 2 (COLOR 2 TBD) <br />ARCH EXT PNL 3 (COLOR 3 TBD) <br />SLIDING DOOR <br />FIBER CEMENT LAP SIDING- WHITE TBD <br />FIBER CEMENT LAP SIDING - GREY TBD <br />FIBER CEMENT PANEL 1 (COLOR 2 TBD) <br />FIBER CEMENT PANEL 2 (COLOR 1 TBD) <br />FIBER CEMENT PANEL 3 (COLOR 3 TBD) <br />FIBER CEMENT TRIM - WHITE TBD <br />FIBER CEMENT TRIM - DARK TBD <br />CAST STONE 16" X 24" BLOCKS <br />CAST STONE BAND <br />GARAGE DOOR <br />OVERHEAD COILING DOOR - PT TO MATCH <br />WINDOW <br />METAL RAILING <br />METAL DOOR - PAINT TO MATCH ADJ. COLOR) <br />ALUM STORE FRONT <br />MULTI-SLIDE DOOR <br />METAL COPING (MATCH ADJ. COLOR) <br />MAGIC PAK LOUVER - PT TO MATCH ADJ. <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />25 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />18 <br />19 <br />20 <br />EXTERIOR MATERIAL LEDGEND <br />21 <br />22 <br />23 <br />24 <br />FACE BRICK 3 (TAN BLEND TBD) <br />CORRUGATED METAL PANEL <br />ALUMINUM TRELLIS - PAINT <br />STANDING SEAM METAL ROOF <br />ARCHITECTURAL PRECAST - BUFF <br />ARCHITECTURAL PRECAST - ACCENT BAND <br />26 <br />17 <br />27 <br />28 <br />29 <br />30 <br />45 DEGREE ANGLE <br />45 DEGREE ANGLE <br />DATE <br />PROJECT NUMBER <br />LOCATION <br />11/01/2019 <br />18-001 <br />Silver <br />Lake Village <br />11/01/2019 <br />BL <br />MD <br />MD <br />11/05/2019 <br />11/05/2019 <br />LOCATION <br />Silver <br />Lake Village <br />09/16/2019 <br />BEN LINDAU <br />EVAN DORAN <br />MICHAEL DUNN <br />11/05/2019 <br />55