My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 19-094 ACCEPTING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE 2020 STREET AND UTILITY IMPROVEMENT PROJECT AND SILVER LANE MILL AND OVERLAY PROJECT
StAnthony
>
City Council
>
City Council Resolutions
>
2019
>
RES 19-094 ACCEPTING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE 2020 STREET AND UTILITY IMPROVEMENT PROJECT AND SILVER LANE MILL AND OVERLAY PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 3:13:12 PM
Creation date
12/12/2019 3:13:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ST. ANTHONY VILLAGE <br />STATE OF MINNESOTA <br />RESOLUTION 19-094 <br />A RESOLUTION ACCEPTING PLANS AND SPECIFICATIONS <br />AND ORDERING ADVERTISEMENT FOR BIDS FOR THE <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT AND <br />SILVER LANE MILL AND OVERLAY PROJECT <br />WHEREAS, the engineering firm of WSB has prepared plans and specifications for the improvement of: <br />2020 Street and Utility Improvement Project <br />• Street & Utility Reconstruction <br />o 32'Avenue NE from Rankin Road to Croft Drive <br />o Croft Drive from 32nd Avenue NE to 31 S` Avenue NE <br />o Storm sewer connection on 31' Avenue NE from Croft Drive to Old <br />Highway 8. <br />o Silver Lake Terrace from Silver Lane to the cul-de-sac <br />• Industrial Park Flood Improvements <br />o Flood mitigation improvements within the industrial park, located south of <br />County Road C (29'1' Avenue NE) <br />Silver Lane Mill and Overlay <br />• Silver Lane from Stinson Boulevard to Silver Lake Road <br />NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony Village that: <br />1.) Such improvements are necessary, cost-effective, and feasible. <br />2.) Such plans and specifications are hereby approved. <br />3.) The consulting engineering firm shall prepare and cause to be inserted in the official paper and in the <br />Finance and Commerce, an advertisement for bids upon the making of such improvements under such <br />approved plans and specifications. The advertisement shall be published for two times, shall specify the <br />work to be done, shall state that bids will be opened on or about January 22, 2020, and bids will be <br />considered by the City Council. Any bidder whose responsibility is questioned during consideration of <br />the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be <br />considered unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier's check, <br />bid bond, or certified check payable to the City of St. Anthony Village for Five (5%) percent of the <br />amount of such bid. <br />Adopted this 10th day of December, 2019. <br />ATTEST: ECG'// N 7 <br />Nico e filler, City C erk <br />Reviewed for administration: <br />rome O. Faust, Mayor <br />Mark Casey, City Manger <br />S: ,ICouncil Meetingsl2019.12102019';Resolution 19-094 - Accept Plans - 2020 Street and Utility Improvement Project.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.