My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 01212020-WORKSESSION
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2020
>
PL PACKET 01212020-WORKSESSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:42:36 AM
Creation date
1/14/2020 4:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks <br />The City Parks Division maintains a <br />total of five primary parks <br />(Emerald, Central, Tower, Silver <br />Point, and Trillium). In addition, the <br />Parks Division maintains the City's <br />ice skating rinks, which are open <br />from about December through <br />February, weather dependent. <br />Emerald Park Central Park <br />St. Anthony Engineering <br />The City of St. Anthony City Engineer is WSB & <br />Associates. They have served in this capacity <br />with the City since 1996. The roll of the City <br />Engineer is to: <br />•Prepare Feasibility Studies, <br />•Make Recommendations on Infrastructure <br />Needs, <br />•Prepare Construction Plans, Speciation's and <br />Solicit Bids <br />•Prepare Assessments <br />•Manage Construction and Contracts <br />Current Priorities Include: <br />•Street and Utility Reconstruction Program <br />•Flood Reduction <br />•Sustainability Efforts
The URL can be used to link to this page
Your browser does not support the video tag.