My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01282020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 01282020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 4:31:59 PM
Creation date
1/21/2020 4:31:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plowing of Secondary Residential <br />Streets and Sidewalks <br />•Follows completion of Primary roads. <br />•The four main plow trucks are utilized to <br />complete the secondary road sections. <br />The routes are divided into four quadrants <br />with Silver lake road dividing east and <br />west and 33rd Ave dividing the north and <br />south sections. <br />•Two sidewalk machines are used to clear <br />all city owned sidewalk and trails <br />throughout. Each machine has a <br />designated route to complete. <br />•Cul-de-sacs, alleys, and short roads are <br />cleared with both 2-ton and 1-ton pickup <br />plow trucks. <br />Plowing continued : <br />•We follow up with all city owned parking lots along with the school <br />district parking lots to include The high school and Wilshire park. <br />•Ice control is performed at the time of plowing as to complete all <br />necessary maintenance in one visit. <br />•The 3 city owned Park shelter locations are then plowed out as well <br />as the 6 sheets of ice. The Water Treatment plant and out building <br />locations such as well houses are the last to be maintained. <br />46
The URL can be used to link to this page
Your browser does not support the video tag.