My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019 Public Works Department Annual Report
StAnthony
>
Administration
>
Annual Reports
>
Public Works Annual Reports
>
2019 Public Works Department Annual Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:26:07 PM
Creation date
3/5/2020 12:24:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 Annual Report • Public Works Department • St. Anthony Village, Minnesota <br /> <br /> <br /> <br />10 <br /> <br />2019 STREET & UTILITY PROJECTS <br />Infrastructure Improvements Completed In 2019 Include: <br />Flood improvements on Silver Lake Road from approximately 250 feet south of Silver Lane to <br />approximately 600 feet north of Silver Lane were completed. Additional stormwater catch <br />basins and trunk storm sewer pipe were installed to increase the capture capacity of stormwater <br />from Silver Lake Road to Silver Lake. This was a cooperative project with Ramsey County, Rice <br />Creek Watershed District, and the Minnesota Department of Natural Resources. <br /> <br /> <br />County Road C Improvements - cooperative project with Ramsey County, Hennepin County <br />and Mississippi Watershed Management Organization. <br /> <br /> Bituminous trail improvements <br /> Concrete sidewalk improvements <br /> Watermain, sanitary sewer, and storm sewer improvements <br /> Industrial Park drainage and flood improvements <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.