My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 04212020
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2020
>
PL PACKET 04212020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 1:54:12 PM
Creation date
4/15/2020 1:53:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 21, 2020 <br />Page 2 <br /> <br /> <br />Use / Zoning: East: Retail Pad Sites – Coffee Shop/Gas Station zoned PUD <br /> South: Railroad, then Commercial/Industrial zoned L-I, Light Industrial <br />West: Multiple Family Residential zoned PUD <br /> <br />Deadline for Agency Application Complete Date: April 6, 2020 <br />Action: 120 Days: August 4, 2020 <br /> <br />ANALYSIS <br />1. Background <br />In December of 2019, the City Council adopted an amendment to the Silver Lake Village <br />Planned Unit Development zoning district approving the redevelopment of the Walmart site <br />as a 496 unit multiple family residential project. The applicant proposed a two-phase <br />multiple family residential project, including a community building and significant site <br />improvements. At the time of the PUD approval, the developer anticipated development on <br />the existing single parcel, legally described as Lot 2, Silver Lake Village. The PUD also <br />included the Salo Pond open space, Outlot B of Silver Lake Village. <br />The development parcels in question are shown on the zoning map below, and are 13 acres <br />in total area. <br />Subsequent to that approval, the applicant has decided to seek a subdivision of the parcel <br />to separate the first phase (which includes the north building of 258 units and the <br />community building, along with associated underground and surface parking) from the <br />second phase, which includes the south building of 238 units, along with additional parking <br />and site improvements. <br />Such subdivisions of multi-phase projects are not uncommon, and often undertaken to <br />separate financing of current construction from future aspects of the project. The applicant <br />is not proposing any long-term changes to the approved PUD, and the terms of the PUD <br />would continue to apply to both phases and parcels. <br />What will change are some of the interim site improvements – although those changes are <br />the result of construction phasing more than a result of the plat. The applicant is seeking to <br />modify emergency vehicle response on the property prior to the second phase of the <br />building, holding more permanent pavement improvements on the south parcel until the <br />second phase is underway. <br />As noted above, the Salo Pond outlot (Outlot B of Silver Lake Village) will not change in <br />boundary or improvements from its original plat and PUD improvements. As such, the <br />proposed subdivision affects only the apartment site, splitting the existing single parcel into <br />two separate development parcels. The site location is shown on the zoning map below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.