My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05122020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 05122020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:38:46 AM
Creation date
5/7/2020 3:31:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
What will change are some of the interim site improvements – although those changes are <br />the result of construction phasing more than a result of the plat. The applicant is seeking to <br />modify emergency vehicle response on the property prior to the second phase of the <br />building, holding more permanent pavement improvements on the south parcel until the <br />second phase is underway. <br />As noted above, the Salo Pond outlot (Outlot B of Silver Lake Village) will not change in <br />boundary or improvements from its original plat and PUD improvements. As such, the <br />proposed subdivision affects only the apartment site, splitting the existing single parcel into <br />two separate development parcels. The site location is shown on the zoning map below. <br /> <br /> <br /> <br />2. Analysis <br /> <br />Preliminary Plat <br /> <br />With only limited exceptions, the subdivision of a parcel into two or more development <br />parcels is done via a plat, which is a mapped and surveyed document recorded with the <br />County that will officially created the separate legal parcels. Platting is regulated by the <br />19
The URL can be used to link to this page
Your browser does not support the video tag.