My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08112020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 08112020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2020 3:53:42 PM
Creation date
8/6/2020 3:33:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report <br />2021 Street and Utility Improvement Project <br />City of St. Anthony Village <br />WSB Project No. 015900-000 PAGE 12 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.53 million. <br /> <br />Due to the poor structural condition of portions of the street sections, the deterioration of the existing <br />sanitary sewer system and frequent water main breaks, this project is both feasible and necessary from <br />an engineering standpoint. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and cost- <br />effective from an engineering standpoint. We recommend reconstruction of the sanitary sewer, water <br />main, stormwater collection system, and the street as detailed in this report. <br />49
The URL can be used to link to this page
Your browser does not support the video tag.