Laserfiche WebLink
<br /> <br />Feasibility Report <br />2021 Street and Utility Improvement Project <br />City of St. Anthony Village <br />WSB Project No. 015900-000 PAGE 12 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.53 million. <br /> <br />Due to the poor structural condition of portions of the street sections, the deterioration of the existing <br />sanitary sewer system and frequent water main breaks, this project is both feasible and necessary from <br />an engineering standpoint. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and cost- <br />effective from an engineering standpoint. We recommend reconstruction of the sanitary sewer, water <br />main, stormwater collection system, and the street as detailed in this report. <br />49