My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08112020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 08112020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2020 3:53:42 PM
Creation date
8/6/2020 3:33:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE F - CHANDLER DRIVE AND FOSS ROAD SANITARY SEWER IMPROVEMENTS <br />131 2021.501 MOBILIZATION L S $6,800.00 1 $6,800.00 <br />132 2104.503 ABANDON PIPE SEWER (SANITARY)L F $10.00 230 $2,300.00 <br />133 2104.503 REMOVE CURB AND GUTTER L F $5.00 30 $150.00 <br />134 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)L F $4.00 60 $240.00 <br />135 2104.505 REMOVE BITUMINOUS PAVEMENT S Y $4.50 780 $3,510.00 <br />136 2104.509 REMOVE SANITARY SEWER SERVICE EACH $100.00 1 $100.00 <br />137 2105.504 GEOTEXTILE FABRIC TYPE 5 S Y $1.50 780 $1,170.00 <br />138 2106.507 EXCAVATION - COMMON (P)C Y $22.00 180 $3,960.00 <br />139 2106.507 EXCAVATION - SUBGRADE (P)C Y $22.00 390 $8,580.00 <br />140 2106.507 SELECT GRANULAR BORROW (CV) (P)C Y $32.00 390 $12,480.00 <br />141 2211.507 AGGREGATE BASE (CV) CLASS 5 (P)C Y $32.00 180 $5,760.00 <br />142 2331.501 JOINT ADHESIVE - MASTIC L F $1.00 520 $520.00 <br />143 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GALLON $3.50 50 $175.00 <br />144 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C)TON $75.00 110 $8,250.00 <br />145 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C)TON $75.00 110 $8,250.00 <br />146 2503.601 SANITARY SEWER BYPASS PUMPING L S $2,500.00 1 $2,500.00 <br />147 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH $1,500.00 2 $3,000.00 <br />148 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH $200.00 1 $200.00 <br />149 2503.602 18"X6" PVC WYE EACH $500.00 1 $500.00 <br />150 2503.603 6" PVC PIPE SEWER - SDR 26 L F $32.00 30 $960.00 <br />151 2503.603 18" PVC PIPE SEWER - SDR 35 L F $85.00 230 $19,550.00 <br />152 2503.603 TELEVISE SANITARY SEWER L F $2.00 230 $460.00 <br />153 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F $15.00 30 $450.00 <br />154 2563.601 TRAFFIC CONTROL L S $1,500.00 1 $1,500.00 <br />155 LIFT STATION PUMP UPGRADE L F $50,000.00 1 $50,000.00 <br />$141,365.00 <br />$7,068.25 <br />$148,433.25 <br />$37,108.31 <br />$185,541.56 <br />OPINION OF PROBABLE COSTS <br />2021 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 015900-000 <br />ST ANTHONY, MN <br />AUGUST 11, 2020 <br />SUBTOTAL SCHEDULE F - CHANDLER DRIVE AND FOSS ROAD SANITARY SEWER IMPROVEMENTS <br />+ 5% CONTINGENCIES <br />SUBTOTAL SCHEDULE F - CHANDLER DRIVE AND FOSS ROAD SANITARY SEWER IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />TOTAL SCHEDULE F - CHANDLER DRIVE AND FOSS ROAD SANITARY SEWER IMPROVEMENTS <br />67
The URL can be used to link to this page
Your browser does not support the video tag.