My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 02162021-WORKSESSION
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2021
>
PL PACKET 02162021-WORKSESSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 12:58:54 PM
Creation date
2/11/2021 12:58:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(KE). Accessory buildings without a Principal <br />Building. No accessory building or structure shall <br />be constructed on any lot prior to the time of <br />construction of the principal building to which it <br />is an accessory unless authorized through an <br />agreement as prepared by the City Attorney and <br />approved by the City Council. <br /> <br />(L). Garage setback permit. A garage which will <br />cover an area of no more than 576 square feet <br />may be located within the side setbacks and/or <br />rear setbacks if a setback permit has been issued <br />for the garage under the following provisions of <br />this section. <br /> (1) Application for a setback permit must be <br />made in writing on forms provided by the City <br />Manager and must be filed with the City <br />Manager, together with a filing fee in the amount <br />required under Chapter 33. The application must <br />include a survey showing the proposed location <br />of the building and the buildings on the property <br />adjoining the setback in question. The application <br />must also address the other matters to be <br />considered by the Planning Commission and City <br />Council, as set forth in division 79A St. Anthony - <br />Land Usage <br /> (1) Application for a setback permit must be <br />made in writing on forms provided by the City <br />Manager and must be filed with the City <br />Manager, together with a filing fee in the amount <br />required under Chapter 33. The application must <br />include a survey showing the proposed location <br />of the building and the buildings on the property <br />adjoining the setback in question. The application <br />must also address the other matters to be <br />considered by the Planning Commission and City <br />Council, as set forth in division (B) above. The <br />permit application will be considered by the <br />Planning Commission and City Council, and notice <br />of the hearing will be given, all in the same <br />manner as provided in § 152.243 for conditional <br />use permits. After the hearing by the Planning <br />Commission, the City Council will grant or deny <br />the permit, stating its reasons for doing so. <br /> (2) In granting or denying the setback permit, <br />the City Council will consider the proximity of the <br />garage to any buildings on the adjoining
The URL can be used to link to this page
Your browser does not support the video tag.