Laserfiche WebLink
11 <br />Pilot a Bicycle Boulevard on a City Street <br />What is a bicycle boulevard? <br />•Signs and pavement markings to <br />indicate a roadway is a shared, slow <br />street. <br />•Designed to give priority to bicyclists <br />as through-going traffic. <br />•Low-cost way to create a connected <br />network of streets with good <br />bicyclist comfort and safety. <br />What are the benefits of a bicycle boulevard? <br />•Differentiates bicycle boulevards from <br />other local streets. <br />•Reminds motorists driving on streets to <br />watch for bicyclists. <br />•Reinforces where bicyclists should be <br />riding in the roadway. <br />•Discourages cut-through-vehicle traffic and <br />allows local motor-vehicle traffic. <br />12 <br />Improvements Noted in 2040 Comp Plan <br />•Various intersections <br />1.Kenzie Terrace/Silver Lake Rd. and St. <br />Anthony Blvd. <br />2.New Brighton Blvd. and St. Anthony <br />Blvd. <br />3.29th Ave. and New Brighton Blvd. <br />4.33rd Ave. and Hwy. 8/Highcrest Rd. <br />•Stinson Blvd. from St. Anthony Blvd. to 37th <br />Ave. <br />•New Brighton Blvd./Old Hwy. 8 from St. <br />Anthony Blvd. to 33rd Ave. <br />•29th Ave. from Stinson Blvd. to New Brighton <br />Blvd. <br />•Silver Lake Rd. from Silver Lane to County <br />Rd. E <br />•Maplewood Dr./Chelmsford Rd. between <br />Skycroft Dr. and 37th Ave. <br />•St. Anthony Blvd. from Stinson Blvd. to <br />Ridgway Pkwy.