My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HRA PACKET 03232021
StAnthony
>
City Council
>
HRA Agenda Packets
>
2021
>
HRA PACKET 03232021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2021 9:26:43 AM
Creation date
4/9/2021 9:03:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saint Anthony Village Lowry Grove Redevelopment TIF District <br />LHB Project No. 170752 Page 7 of 11 Final Report <br />Diagram 2 – Coverage Diagram <br />Shaded area depicts a parcel more than 15 percent occupied by buildings, streets, utilities, <br />paved or gravel parking lots or other similar structures <br /> <br /> <br /> <br />B. CONDITION OF BUILDING TEST <br /> <br />1. BUILDING INSPECTION <br />The first step in the evaluation process is the building inspection. After an initial walk- <br />thru, the inspector makes a judgment whether or not a building “appears” to have enough <br />defects or deficiencies of sufficient total significance to justify substantial renovation or <br />clearance. If it does, the inspector documents with notes and photographs code and non- <br />code deficiencies in the building. <br /> <br />2. REPLACEMENT COST <br />The second step in evaluating a building to determine if it is substandard to a degree <br />requiring substantial renovation or clearance is to determine its replacement cost. This is <br />32
The URL can be used to link to this page
Your browser does not support the video tag.