My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 06072021
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
2021
>
PK PACKET 06072021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 4:33:07 PM
Creation date
6/3/2021 4:22:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Size of Raingarden <br />Depth: <br />•8” <br />•2” compost <br />•2” double shredded hardwood mulch <br />Maximum Size: <br />4,356 sq ft (drainage area) <br />24 inches (daily infiltration)= up to 181 sq ft <br />Planned Size: <br />•16’ x 10’ “bean-shaped” <br />•~135 sq ft <br />Installation Plans <br />1.10” of soil will be removed <br />2.2” of compost will be added to soil (.833 cubic yards) <br />3.Area will be raked to achieve proper slope <br />4.Shrubs will be planted <br />5.2” of mulch will be added (.833 cubic yards) <br />Note: Plants will require water this first season
The URL can be used to link to this page
Your browser does not support the video tag.