Laserfiche WebLink
6/3/2021 <br />7 <br />Tower Inspection <br />Completed on November 12, 2020 by KLM Tank Inspections <br />•Topcoat delamination of roof and bowl <br />•Pinhole corrosion <br />•Corrosion at base of wet riser <br />•Finial vents not AWWA, OSHA, and <br />Minnesota Dept of Health compliant <br />•Handrail and ladders not OSHA <br />compliant <br />Exterior Inspection Findings <br />Estimated Cost <br />Construction Cost = $610,000-$640,000 <br />Design & Bidding Services (WSB) = $20,000 <br />Construction & Coatings Inspection (TBD) = $60,000-$90,000 <br />Total = $690,000-$750,000 <br />13 <br />14