My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 06082021
StAnthony
>
City Council
>
City Council Work Session
>
2021
>
CC WORKSESSION PACKET 06082021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 12:09:33 PM
Creation date
6/4/2021 12:07:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWER NUMBER ONE CITY OF ST. ANTHONY, MINNESOTA <br /> <br />Copyright 2020 by KLM Engineering, Inc. Page 7 <br />structural modifications, abrasive blasting, and painting. However, most of the exterior structural modifications can <br />be performed prior to draining, with the tank in-service. <br />On January 1, 2023, National Sanitary Foundation (NSF) will implement a new health requirement called NSF 600 <br />which will require all coatings in contact with potable water to meet new, lower extraction levels. These new limits <br />may restrict available product offerings and qualified applicators resulting in increased overall reconditioning costs. <br />The costs for applying a coating system, that complies with the new regulation, to the interior wet area is not included <br />in the provided cost estimate. <br />4.2|Remaining Tank Life <br />Based on the inspection data, if the recommended structural repairs and coating replacement are completed within <br />the next three (3) years, the tank will be satisfactory for continued service provided that it is inspected and <br />maintained regularly. <br />The tank and coating should first be inspected within the warranty period and every three (3) to five (5) years <br />thereafter. New interior and exterior coatings, if applied and maintained properly, should last at least 20 years. <br /> <br />KLM ENGINEERING, INC. <br />Report prepared by: <br /> <br />Jerry J. Tell, P.E. <br />Manager of Engineering <br />MN License No. 15524 <br /> <br /> <br />Report reviewed and certified by: <br /> <br />Rodney Ellis <br />Vice President/COO <br />NACE Certified Coatings Inspector No. 1686 <br />AWS/CWI 04040311 <br /> <br />November 23, 2020 <br />Copyright 2020 by KLM Engineering, Incorporated. All rights reserved. This material may not be duplicated <br />reproduced, displayed, modified, or distributed without the prior express written permission of KLM <br />Engineering, Incorporated. <br />P:\2020\2020 Evaluations And Photos\St. Anthony MN2384 0.25MG Tower No. 1\St. Anthony MN2384 Full Report FINAL.Docx
The URL can be used to link to this page
Your browser does not support the video tag.