My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08102021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 08102021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:38:52 AM
Creation date
8/6/2021 11:37:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.29 million. <br /> <br />Due to the poor structural condition of portions of the street sections, the age of the existing sanitary <br />sewer system and water main, this project is both feasible and necessary from an engineering standpoint. <br /> <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and cost- <br />effective from an engineering standpoint. We recommend reconstruction of the sanitary sewer, water <br />main, stormwater collection system, and the street as detailed in this report. <br />44
The URL can be used to link to this page
Your browser does not support the video tag.