My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08102021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 08102021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:38:52 AM
Creation date
8/6/2021 11:37:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />72 2104.502 REMOVE GATE VALVE & BOX EACH $200.00 6 $1,200.00 <br />73 2104.503 REMOVE WATER MAIN L F $5.00 2,100 $10,500.00 <br />74 2104.509 REMOVE WATER SERVICE AND CURB BOX EACH $150.00 23 $3,450.00 <br />75 2104.509 REMOVE HYDRANT AND VALVE EACH $350.00 3 $1,050.00 <br />76 2451.603 AGGREGATE BEDDING L F $10.00 100 $1,000.00 <br />77 2504.601 TEMPORARY WATER SERVICE L S $10,000.00 1 $10,000.00 <br />78 2504.602 CONNECT TO EXISTING WATER SERVICE EACH $300.00 23 $6,900.00 <br />79 2504.602 CONNECT TO EXISTING WATER MAIN EACH $2,000.00 11 $22,000.00 <br />80 2504.602 1" CORPORATION STOP EACH $250.00 23 $5,750.00 <br />81 2504.602 1" CURB STOP & BOX EACH $300.00 23 $6,900.00 <br />82 2504.602 8" GATE VALVE AND BOX EACH $2,500.00 12 $30,000.00 <br />83 2504.602 HYDRANT ASSEMBLY EACH $6,500.00 3 $19,500.00 <br />84 2504.603 1" TYPE K COPPER PIPE L F $32.00 730 $23,360.00 <br />85 2504.603 6" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP L F $52.00 30 $1,560.00 <br />86 2504.603 8" WATER MAIN-DUCT IRON CL 52 W/ POLY WRAP L F $58.00 2,100 $121,800.00 <br />87 2504.604 4" POLYSTYRENE INSULATION S Y $45.00 400 $18,000.00 <br />88 2504.608 DUCTILE IRON FITTINGS POUND $10.00 1,200 $12,000.00 <br />$294,970.00 <br />$14,748.50 <br />$309,718.50 <br />$61,943.70 <br />$371,662.20 <br />OPINION OF PROBABLE COSTS <br />2022 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. 018118-000 <br />ST ANTHONY, MN <br />AUGUST 10, 2021 <br />SUBTOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />+ 5% CONTINGENCIES <br />SUBTOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />+ 20% ADMINISTRATIVE, LEGAL, ETC. <br />TOTAL SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />60
The URL can be used to link to this page
Your browser does not support the video tag.