My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08172021
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2021
>
PL PACKET 08172021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:02:08 AM
Creation date
8/12/2021 4:05:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STINSON PARKWAY NE.8TERRACE(COUNTYROADNO.153)EXCEPTION EXCEPTION <br />12(FKA - STATE HIGHWAY NO. 63)1NOPARKINGCONSTRUCTION LIMITSINLET PROTECTION ATCATCH BASINS, TYPINLET PROTECTION ATCATCH BASINS, TYPCONSTRUCTIONENTRANCEPERIMETER EROSIONCONTROL ATCONSTRUCTIONLIMITS, TYP.CONTRACTOR TO PROVIDEINLET PROTECTION AT ALLDOWNSTREAM CATCHBASINS.Civil Engineering Surveying Landscape Architecture4931 W. 35th Street, Suite 200St. Louis Park, MN 55416civilsitegroup.com 612-615-00602401 NE LOWRY AVE <br />2401 NE LOWRY AVENUE; ST. ANTHONY, MN 55418 <br />6390 CARLSON DRIVE; EDEN PRAIRIE, MN 55346 <br />INTERSTATE DEVELOPMENT CORPORATION <br />PROJECT <br />ISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION............PROJECT NUMBER:21308............07/20/21CITY SUBMITTALDRAWN BY:REVIEWED BY:KW, RLMP, PS..............COPYRIGHT CIVIL SITE GROUP INC.cP <br />R <br />E <br />L <br />I <br />M <br />I <br />N <br />A <br />R <br />Y <br />: <br />N <br />O <br />T <br /> <br />F <br />O <br />R <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N44263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.07/20/21REVISION SUMMARYDATEDESCRIPTIONSW1.1SWPPP - PROPOSEDCONDITIONS............01" = 20'-0"20'-0"10'-0"NKnow what'sbelow.before you dig.CallR1. RESERVED FOR CITY SPECIFIC EROSION CONTROL NOTES.CITY OF ST. ANTHONY EROSION CONTROL NOTES:1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT"GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS,48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR ORREPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COSTTO THE OWNER.2. THIS PROJECT IS GREATER THAN ONE ACRE AND WILL REQUIRE AN MPCANPDES PERMIT. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY EROSIONCONTROL PERMITS REQUIRED BY THE CITY.3.SEE SHEETS SW1.0 - SW1.5 FOR ALL EROSION CONTROL NOTES,DESCRIPTIONS, AND PRACTICES.4.SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSION CONTROLNOTES.5.CONTRACTOR IS RESPONSIBLE FOR SWPPP IMPLEMENTATION, INSPECTIONS,AND COMPLIANCE WITH NPDES PERMIT.SWPPP NOTES:LEGEND:EX. 1' CONTOUR ELEVATION INTERVALINLET PROTECTIONSTABILIZED CONSTRUCTION ENTRANCEDRAINAGE ARROW1.0' CONTOUR ELEVATION INTERVALSILT FENCE / BIOROLL - GRADING LIMITEROSION CONTROL BLANKETALL SPECIFIED EROSION AND SEDIMENT CONTROL PRACTICES, ANDMEASURES CONTAINED IN THIS SWPPP ARE THE MINIMUMREQUIREMENTS. ADDITIONAL PRACTICES MAY BE REQUIRED DURINGTHE COURSE OF CONSTRUCTION.
The URL can be used to link to this page
Your browser does not support the video tag.