My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08172021
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2021
>
PL PACKET 08172021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 10:02:08 AM
Creation date
8/12/2021 4:05:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Type II 24-hr 100-Year Rainfall=7.32"21308 - EXISTING <br /> Printed 7/15/2021Prepared by {enter your company name here} <br />Page 16HydroCAD® 10.10-6a s/n 02202 © 2020 HydroCAD Software Solutions LLC <br />Time span=0.00-240.00 hrs, dt=0.01 hrs, 24001 points <br />Runoff by SCS TR-20 method, UH=SCS, Weighted-Q <br />Reach routing by Stor-Ind method - Pond routing by Stor-Ind method <br />Runoff Area=74,957 sf 89.06% Impervious Runoff Depth=6.85"Subcatchment EX1: EX. 1 (DRAINS TO <br /> Tc=6.0 min CN=WQ Runoff=17.63 cfs 0.983 af <br />Runoff Area=7,155 sf 9.78% Impervious Runoff Depth=5.20"Subcatchment EX2: EX2 (DRAINS OFF SITE <br /> Tc=6.0 min CN=WQ Runoff=1.44 cfs 0.071 af <br />Total Runoff Area = 1.885 ac Runoff Volume = 1.054 af Average Runoff Depth = 6.71" <br />17.85% Pervious = 0.336 ac 82.15% Impervious = 1.549 ac
The URL can be used to link to this page
Your browser does not support the video tag.