My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09142021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 09142021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 4:24:32 PM
Creation date
9/9/2021 4:15:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY PLAN PUD –RECOMMENDED CONDITIONS <br />1. The applicant participates in a subdivision of the <br />portion of 2654 Kenzie that encroaches into the alley <br />and the City retains ownership of that remnant. <br />2. Access-related issues shall be subject to comment <br />and recommendation by the City Engineer, as well as <br />Hennepin County and Minneapolis Park Board. <br />3. The proposed bank site plan is modified to increase <br />drive-through lane stacking space. <br />4. The applicants modify the landscaping plan for the <br />bank location to retain a portion of the existing <br />evergreen plantings. <br />5. The proposed monument sign on the bank site is <br />placed and designed to meet city ordinances for size <br />and setback. If an electronic display is desired, the <br />applicants will need to apply for a separate Conditional <br />Use Permit under the applicable code. <br />6. The lighting plan for the proposed bank site is <br />modified to show a zero footcandle light intensity at the <br />boundary with the senior residential property to the <br />west. <br />7. The applicant adds foundation plantings along the <br />Stinson and Kenzie frontages of the residential building. <br />PRELIMINARY PLAN PUD –RECOMMENDED CONDITIONS <br />8. The City finds that the proposed parking supply is <br />adequate to serve the residential facility. <br />9. Final PUD Plans demonstrate compliance with ADA <br />parking supply requirements (for disabled persons). <br />10. As part of the Final PUD Plan submission, a final <br />signage plan be submitted for review which <br />demonstrates compliance with City requirements. <br />11. Issues related to grading, drainage and utilities shall <br />be subject to comment and recommendation by the <br />City Engineer. <br />12. The applicant enter into a PUD agreement with the <br />City and post all the necessary securities required by it. <br />13. The applicant executes the required land transfers <br />suitable to the City Council. <br />14. Consideration of comments of other City Staff. <br />48
The URL can be used to link to this page
Your browser does not support the video tag.